Skip to main content

Zalazone test track gears up

Work on the US$159 million Zalazone project started in 2017 and is on schedule.
By David Arminas June 5, 2020 Read time: 2 mins
Zalazone’s braking platform is for ABS, ATC and ESP tests (photo Zalazone/palyamodulok_03a)

The second phase of Hungary’s 265-hectare autonomous vehicle Zalazone test track is nearing completion, according to the minister of innovation.

Laszlo Palkovics said the US$159 million project which started in 2017 is on schedule and progressing in three phases. The track is near Zalaegerszeg, around 180km southwest of Budapest

Phase one involved setting up basic elements such a braking platform, a vehicle handling course and a typical country road layout. The braking platform is designed to carry out ABS, ATC and ESP tests along eight types of surfaces and watering systems and also allows for high-speed platooning tests.

Phase one also saw the start of the Smart City area, a city-like area to provide realistic traffic circumstances in a closed area that contains more environmental, traffic, traffic engineering and vehicle dynamic elements.

The second phase, now nearing completion, includes a high-speed oval, bad roads and slopes and additional aspects of the Smart City.

Phase three will be development from 2022 onwards, according to the organisation’s website. It will add more facilities to the Smart City Zone such as more types of lanes, surfaces and road geometry. Different type of building and facades will be placed next to the street grid of Smart City Zone.

Budapest University of Technology, University of Pannonia and Széchenyi Istvány University do much of their vehicular and transportation research at Zalazone.

Related Content

  • New methods allow concrete testing on the spot
    July 20, 2015
    This month we look at two new methods which are allowing concrete to be tested on the spot, and [over the page] we catch up on the latest news from concrete testing equipment suppliers - Kristina Smith writes Sometimes test results can be very bad news. If the concrete pavement or bridge abutment has already been poured, and if the concrete does not meet the specification, the outcome could be very expensive remedial work.
  • Ahmedabad airport roll-out for Dynapac
    September 7, 2022
    Dynapac machines have set production records during the upgrade of Sardar Vallabhbhai Patel International Airport in the Indian state of Gujarat.
  • China: IRF Geneva supports the World Transport Convention 2018
    May 16, 2018
    IRF Geneva’s long-standing partnership and collaboration with China Highways and Transportation Society (CHTS) and with the Government of China will be at centre stage again this year. This will be seen at the World Transport Convention 2018 to be hosted in Beijing from 18th to 21st June. The 2017 edition of the World Transport Convention (WTC) was hosted by the China Association for Science and Technology (CAST) and organised by the China Highway & Transportation Society (CHTS). It also had the support o
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out