Skip to main content

Xylem’s Godwin to showcase non-clog pumps with Flygt N-technology

Showcasing its range of Godwin portable pumps featuring non-clog Flygt N-technology will be Xylem, which says its Godwin NC-Series is engineered to deliver clog-free pumping for maximum uptime and effectiveness. The design of Flygt N-hydraulics allows stringy solids to pass through easily without clogging the pump and has been used successfully in Flygt dry installed and submersible pumps since 1997. The Flygt N-technology has been proven in more than 300,000 water and wastewater installations around the wo
January 6, 2017 Read time: 2 mins
Showcasing its range of 711 Godwin Pumps featuring non-clog 3939 Flygt N-technology will be 3936 Xylem, which says its Godwin NC-Series is engineered to deliver clog-free pumping for maximum uptime and effectiveness.

The design of Flygt N-hydraulics allows stringy solids to pass through easily without clogging the pump and has been used successfully in Flygt dry installed and submersible pumps since 1997. The Flygt N-technology has been proven in more than 300,000 water and wastewater installations around the world.

Andrew Jones, head of Xylem’s dewatering business said: “In sewage bypass and other wastewater pumping, fibre and stringy solids can cause difficulties. Pumps can often clog requiring maintenance and resulting in unplanned downtime. Xylem’s engineering teams in the UK, Sweden and the United States have integrated Flygt N-technology into our flagship Godwin Dri-Prime range to create this non-clog range that ideally suited for a multitude of applications within the construction and municipal industries.”

Xylem’s Godwin NC Series (models NC80, NC100 and NC150) are capable of flows up to 400m³/hour) and heads up to 60m. The NC Series is offered with diesel engine or electric motor options, on highway trailer or skid base. Pump enclosures that minimise noise are also available for use in residential areas.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.XylemInc.com www.XylemInc.com false http://www.xyleminc.com/ false false%>

For more information on companies in this article

Related Content

  • Impact crusher boosts Terex Finlay line-up
    April 22, 2013
    Terex Finlay has joined forces with German screenbox constructor Spaleck to create the 883 Spaleck 3D Combi Flip-Flow screen. A stepped top deck design, combined with flip-flow technology on the bottom deck, provides all-in-one processing capabilities for waste, recycling, shred metal, wood, compost, ores and coal.
  • Volvo launches on-board weighing at Intermat
    January 6, 2017
    Volvo’s F-series articulated dump trucks with full suspension can be specified with the company’s On Board Weighing (OBW) system, which won Gold in the Civil Engineering Equipment category of the prestigious Intermat 2012 Innovation Awards. The OBW cleverly monitors weight from pressure sensors in the ADT’s suspension system, to give payload information. The fully automatic system logs all transported loads.When used with Volvo’s CareTrack telematics system OBW can be accessed remotely, revealing total tran
  • Volvo launches on-board weighing at Intermat
    April 11, 2012
    Volvo’s F-series articulated dump trucks with full suspension can be specified with the company’s On Board Weighing (OBW) system, which won Gold in the Civil Engineering Equipment category of the prestigious Intermat 2012 Innovation Awards. The OBW cleverly monitors weight from pressure sensors in the ADT’s suspension system, to give payload information. The fully automatic system logs all transported loads.When used with Volvo’s CareTrack telematics system OBW can be accessed remotely, revealing total tran
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru