Skip to main content

Xylem upgrades Flygt 2600 drainage pumps

Upgrades to the Flygt 2600 drainage pump series have been designed to make them even more reliable and durable than before. Xylem vice president and business unit leader Andrew Jones said that they are ideal for the toughest dewatering applications. He said that they have at least three times more wear resistance than conventional drainage pumps. The enhancements include increased durability of the seal system, greater protection against corrosion, a simplified design and improved capabilities for dry runni
April 16, 2013 Read time: 1 min
Flygt 2600 drainage pump from Xylem
Upgrades to the 3939 Flygt 2600 drainage pump series have been designed to make them even more reliable and durable than before.

3936 Xylem vice president and business unit leader Andrew Jones said that they are ideal for the toughest dewatering applications. He said that they have at least three times more wear resistance than conventional drainage pumps.

The enhancements include increased durability of the seal system, greater protection against corrosion, a simplified design and improved capabilities for dry running.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.XylemWaterSolutions.com www.XylemWaterSolutions.com false http://www.xylemwatersolutions.com/ false false%>

For more information on companies in this article

Related Content

  • Improved access technology from Ruthmann
    January 6, 2017
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Improved access technology from Ruthmann
    January 31, 2013
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • New technical centre boosts CMS Cepcor
    January 6, 2017
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.