Skip to main content

XGMA crucial in Iran rescue

When a devastating 6.2 magnitude earthquake hit Iran’s northwestern province of East Azerbaijan earlier in 2012, the impact on the population was enormous. Over 300 people were killed while over 3000 were injured. XGMA’s Iranian dealer Sadaf Machine responded to the earthquake quickly by sending machines and operators to join the rescue operations in the town of Varzaghan near the City of Ahar and the provincial capital of Tabriz, just one day after the the earthquake struck. More than 80% of the buildings
November 23, 2012 Read time: 2 mins
When a devastating 6.2 magnitude earthquake hit Iran’s northwestern province of East Azerbaijan earlier in 2012, the impact on the population was enormous.

Over 300 people were killed while over 3000 were injured. 2713 XGMA’s Iranian dealer 6924 Sadaf Machine responded to the earthquake quickly by sending machines and operators to join the rescue operations in the town of Varzaghan near the City of Ahar and the provincial capital of Tabriz, just one day after the the earthquake struck.

More than 80% of the buildings in most villages of Ahar, which is located in a mountainous area, are built with mud and very vulnerable to quake. Some villages were almost totally flattened by the earthquake, and communications were interrupted in many parts of the region.

After the earthquake, non-governmental organisations joined hands with the Iranian Government in the rescue operations. During the days immediately after the earthquake, XGMA’s Iranian dealer Sadaf Machine made arrangements to have the loaders and excavators in stock of XGMA’s secondary dealer closest to Ahar used for rescue operations and clearing collapsed buildings. One operator who has received operation and maintenance training from XGMA also arrived at the affected area the night after the earthquake, together with his machine, and immediately joined the rescue work. During the day time he was busy operating his XGMA loader to clear the collapsed buildings in a place not far from the makeshift tents which now accommodated the homeless.

XGMA’s XG958 wheeled loader was the primary machine used in the rescue operations, although XG821 excavators were also involved. Sadaf’s headquarters sent two volunteer rescuers and one operator to Varzaghan, to help with the rescue work.

After this, many more XGMA machines were assigned to the area, and XGMA and its Iranian dealer became actively involved in the rebuilding program announced by the Iranian Government.

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 50458 0 oLinkExternal www.xiagong.com www.xiagong.com false /EasySiteWeb/GatewayLink.aspx?alId=50458 true false%>

For more information on companies in this article

Related Content

  • Hyundai’s hydraulic hybrid offers 20% fuel savings
    January 6, 2017
    Hyundai Heavy Industries is showcasing a hydraulic hybrid machine at bauma. The R220-LC Hi-POSS is a 22tonne-crawler excavator with a system that allows brake energy to be used for other functions. Hi-POSS stands for Hyundai intelligent power optimal sharing and energy saving. “This is the most novel thing we have,” said Hyundai product engineer Joachim Van de Perre. “With a conventional excavator, when you brake, the energy heats the hydraulic oil. Here we use the energy to perform another task with the ma
  • Hyundai’s hydraulic hybrid offers 20% fuel savings
    April 18, 2013
    Hyundai Heavy Industries is showcasing a hydraulic hybrid machine at bauma. The R220-LC Hi-POSS is a 22tonne-crawler excavator with a system that allows brake energy to be used for other functions. Hi-POSS stands for Hyundai intelligent power optimal sharing and energy saving. “This is the most novel thing we have,” said Hyundai product engineer Joachim Van de Perre. “With a conventional excavator, when you brake, the energy heats the hydraulic oil. Here we use the energy to perform another task with the ma
  • A future UK government should focus more on potholes and road safety
    April 10, 2015
    With a national UK election looming next month, a future government must make road safety a top priority, said the Institute of Advanced Motorists (IAM). Half of motorists in a recent survey of 2,156 people, and conducted IAM in March, said the current administration has not given the issue as much attention as is needed. The number one issue that the government should be focussing on, according to 70% of respondents, is the reduction of the number of potholes. The backlog of repairs now tops more
  • Chrono Flex seeks additional partners for hose repair services
    January 6, 2017
    Visitors to the Chrono Flex stand can imagine themselves in either the Sahara or the frozen north. The company has set up a convivial stand, equipped with an ice bar and a Saharan tent to emphasise that even the hottest and coldest places are within reach of its emergency hydraulic hose repair services. Broken hoses can paralyse a construction site, says the company, whose network of technicians operate from mobile workshops and aim to be on site within an hour.