Skip to main content

XCMG celebrate start of European R&D HQ build

XCMG has staged a foundation laying ceremony to mark the start of work on the Chinese construction machine manufacturing giant’s first European HQ. Based in Krefeld, Germany, XCMG Europe’s state-of-the-art €36million plus home is set to be completed and operational by July 2013. Meanwhile, the ambitious firm has completed a stockholding rights transfer which gives it a controlling 52% stake in renowned German concrete machinery firm Schwing.
July 11, 2012 Read time: 2 mins
2490 XCMG has staged a foundation laying ceremony to mark the start of work on the Chinese construction machine manufacturing giant’s new European HQ for hydraulic valve and system research and development.

Based in Krefeld, Germany, XCMG Europe’s state-of-the-art €36million plus site is set to be completed and operational by July 2013.

Meanwhile, the ambitious firm has completed a stockholding rights transfer which gives it a controlling 52% stake in renowned German concrete machinery firm 4991 Schwing.

XCMG has also staged another ceremony to mark the start of production at four new construction machine manufacturing sites in Xuzhou, China.

The new European R&D facility will see XCMG staff working closely with hydraulic valve and system experts from German company FT and AMCA Holland. Both firms were acquired by XCMG in 2011.

Speaking at the foundation laying ceremony in Krefeld Wang Min, president of XCMG, said: “The European strategy is of great significance in terms of the overall objectives and strategy of XCMG. Germany and Europe are home to abundant technological resources and represent state-of-the –art research and development and manufacturing. In the future XCMG will develop more projects in Europe, carrying out system integration and construction of leading technology projects to facilitate XCMG becoming a world-class enterprise.”

The four new Xuzhou manufacturing sites, which cost more than €154.5million (RMB 1.2bn) to develop, will produce all-terrain cranes, wheeled loaders, and concrete pumping and mixing machinery. XCMG say the plants are forecast to generate new production value of €5.15billion (RMB 40billion) a year.

XCMG says it is the leader of wheeled loader machine technology in China.

On the opening of the new Xuzhou facilities, Wang Min said: “XCMG’s four manufacturing bases are the fruits of XCMG’s accumulation of industrial knowledge and experience for several decades.”

For more information on companies in this article

Related Content

  • Yanmar CEE introduces B75W, B95W and B110W wheeled excavators
    April 26, 2018
    Yanmar Construction Equipment Europe (CEE) has introduced the B75W, B95W and B110W compact wheeled excavators. The machines have lifting capacities of the 7400 kg, 9300 kg and 11000 kg respectively. Fitted with Yanmar EU Stage IV / EPA Tier 4 Final engines, the wheeled excavators have an integrated smart control system that provides the driver with maximum control, and allows excavator functions to be adapted to the driver and construction site if required.
  • Hyundai deal for Doosan
    July 30, 2021
    Hyundai’s purchase deal for Doosan has been cleared.
  • Innovative machine control systems for Canadian slipforming work
    November 29, 2013
    Advanced machine control technologies are speeding site layout and construction operations Canadian house building firm Mattamy Homes has brought in a contractor that has used sophisticated equipment to build the roads around its new development in Oakville, Ontario. The site is just 30 minutes drive from Toronto. Phase 1-A of the project is under construction and nearly every one of the 550 homes that will be built there has been sold already. Additional phases will bring the total number of homes to 1,800
  • New bridge over China’s Yi River
    December 10, 2015
    A new bridge has been built in China that now spans the Yi River. A crane from XCMG has played a key role in the work, being used to erect the two 100m-high towers for the structure. The bridge is made from prestressed concrete and is a cable-stayed structure, with two towers providing support for the necessary cables. Building this large bridge required the use of sophisticated technology and the project team opted to use a 100m-high tower crane to help lift key elements of the structure into place. The c