Skip to main content

World’s largest hammer makes breakthrough at bauma

HammerHead Trenchless Equipment unveiled the world’s largest pneumatic pipe ramming hammer at bauma. The 865mm hammer can install casings 1.22m to 4.57m in diameter in drainage culvert and wash-over applications and can be used for pipe assist or pipe extraction, guided pilot bore ramming, and horizontal directional drilling assist. The hammer was recently field-proven in an Ontario, Canada, wash-over casing job where it successfully installed 56m of 1.83m-diameter steel casing. HammerHead CEO and president
April 18, 2013 Read time: 2 mins
Worlds largest hammer breaks through at bauma
7304 HammerHead Trenchless Equipment unveiled the world’s largest pneumatic pipe ramming hammer at 688 Bauma.

The 865mm hammer can install casings 1.22m to 4.57m in diameter in drainage culvert and wash-over applications and can be used for pipe assist or pipe extraction, guided pilot bore ramming, and horizontal directional drilling assist.

The hammer was recently field-proven in an Ontario, Canada, wash-over casing job where it successfully installed 56m of 1.83m-diameter steel casing.

HammerHead CEO and president Brian Metcalf said, “We are excited to offer this extraordinary new product to our customers. Our new solid body 34inch [865mm] hammer enables us to provide solutions to the most challenging of projects on contractors’ job sites worldwide. The amount of power generated through our unique design and patented air reverse, that allows for forward and reverse from the control station, will provide contractors with productivity never before available for installation of large diameter pipe.”

Metcalf continued: “The release of the world’s largest pneumatic hammer cements our position as the leading manufacturer of pipe ramming and pipe bursting products available in the trenchless market today for the installation of underground utilities.”

The 865mm rammer has already been released for production, and 1.22m collets are available. Ram adapter cones are currently in development for other sizes, ranging from 1.22m through to 4.57m.

Although the hammer is designed specifically for pipe ramming projects, with custom-built tooling it can also be used for pipe bursting to replace 915mm pipe and larger. HammerHead will provide custom-built accessories upon request.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.HammerHeadTrenchless.com www.HammerHeadTrenchless.com false http://www.hammerheadtrenchless.com/ false false%>

For more information on companies in this article

Related Content

  • Rud’s C-lock tyre system offers ease of use
    January 16, 2014
    Rud’s latest R-Lock and C-Link products are said to make the installation and repair of tyre protection chains quicker and safer. The Easy R-Lock’s revolutionary design replaces conventional, risky, hammer-home rolled steel securing pins and hazardous cutting gear with an integral, hex-key-operated two-piece, locking device. This simplifies and speeds the installation and removal of tyre protection chains. The product also offers benefits when there is a need to replace a damaged wear link. Until now, commo
  • Specialist treatment solutions benefitting the environment
    January 6, 2017
    MS designs, manufactures and installs reliable and efficient solutions for liquids/solids separation and its stand at INTERMAT features a working display of the company’s technology. With increasingly strict environmental protection regulations affecting all areas of industry, MS supplies its solutions to three distinct areas of operation. They include the washing of aggregates, managing of waste products from underground works and solutions designed for civil engineering projects. The washing of aggregates
  • Specialist treatment solutions benefitting the environment
    April 19, 2012
    MS designs, manufactures and installs reliable and efficient solutions for liquids/solids separation and its stand at INTERMAT features a working display of the company’s technology. With increasingly strict environmental protection regulations affecting all areas of industry, MS supplies its solutions to three distinct areas of operation. They include the washing of aggregates, managing of waste products from underground works and solutions designed for civil engineering projects. The washing of aggregates
  • Advanced high reach capability from Haulotte’s latest access plaform
    January 6, 2017
    According to Haulttoe, its new HT 23 RTJ platform offers a wider working envelope than previous designs in its size class. Platform working height is 22.5m, while its horizontal outreach is 18.3m, around 1m higher than competing units. A dual load system is available as an option, allowing a lifting capacity up to 450kg while the machine is said to offer a high lifting speed, taking just 56 seconds to reach full height and increasing its productivity in this product segment. It also offers high manoeuvrabi