Skip to main content

World’s largest hammer makes breakthrough at bauma

HammerHead Trenchless Equipment unveiled the world’s largest pneumatic pipe ramming hammer at bauma. The 865mm hammer can install casings 1.22m to 4.57m in diameter in drainage culvert and wash-over applications and can be used for pipe assist or pipe extraction, guided pilot bore ramming, and horizontal directional drilling assist. The hammer was recently field-proven in an Ontario, Canada, wash-over casing job where it successfully installed 56m of 1.83m-diameter steel casing. HammerHead CEO and president
April 18, 2013 Read time: 2 mins
Worlds largest hammer breaks through at bauma
7304 HammerHead Trenchless Equipment unveiled the world’s largest pneumatic pipe ramming hammer at 688 Bauma.

The 865mm hammer can install casings 1.22m to 4.57m in diameter in drainage culvert and wash-over applications and can be used for pipe assist or pipe extraction, guided pilot bore ramming, and horizontal directional drilling assist.

The hammer was recently field-proven in an Ontario, Canada, wash-over casing job where it successfully installed 56m of 1.83m-diameter steel casing.

HammerHead CEO and president Brian Metcalf said, “We are excited to offer this extraordinary new product to our customers. Our new solid body 34inch [865mm] hammer enables us to provide solutions to the most challenging of projects on contractors’ job sites worldwide. The amount of power generated through our unique design and patented air reverse, that allows for forward and reverse from the control station, will provide contractors with productivity never before available for installation of large diameter pipe.”

Metcalf continued: “The release of the world’s largest pneumatic hammer cements our position as the leading manufacturer of pipe ramming and pipe bursting products available in the trenchless market today for the installation of underground utilities.”

The 865mm rammer has already been released for production, and 1.22m collets are available. Ram adapter cones are currently in development for other sizes, ranging from 1.22m through to 4.57m.

Although the hammer is designed specifically for pipe ramming projects, with custom-built tooling it can also be used for pipe bursting to replace 915mm pipe and larger. HammerHead will provide custom-built accessories upon request.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.HammerHeadTrenchless.com www.HammerHeadTrenchless.com false http://www.hammerheadtrenchless.com/ false false%>

For more information on companies in this article

Related Content

  • Italy at bauma 2013
    April 8, 2013
    Italian construction equipment manufacturers will be in abundance at bauma 2013, showcasing their impressive range of machines and technologies based on a rich and proud history of engineering excellence. The Munich-based show’s status as the largest construction equipment industry exhibition in the world represents the perfect platform for Italian firms to increase their customer base and enhance their global standing. The timing of bauma 2013, with all its associated trading and networking opportunities,
  • Sateco claims world formwork first
    January 6, 2017
    Sateco says its new detensioning spacer unit is a world first for the construction industry. The product is fitted with a side nut that acts as a valve, releasing the force acting on the formwork rod after concrete has dried. When the side nut is manoeuvred, the detensioning spacer unit is moved, thus releasing the pressure acting on the main nut. The main nut is then easier to unscrew, allowing faster and less strenuous form removal. Product designers at France-based Sateco came up with the detensionsing s
  • Sateco claims world formwork first
    April 12, 2012
    Sateco says its new detensioning spacer unit is a world first for the construction industry. The product is fitted with a side nut that acts as a valve, releasing the force acting on the formwork rod after concrete has dried. When the side nut is manoeuvred, the detensioning spacer unit is moved, thus releasing the pressure acting on the main nut. The main nut is then easier to unscrew, allowing faster and less strenuous form removal. Product designers at France-based Sateco came up with the detensionsing s
  • JLG’s 340AJ and 1500SJ get European show debut at INTERMAT 2012
    January 6, 2017
    Making their first appearances at a major European construction show are the 340AJ and 1500SJ from aerial work platforms and telescopic material handler manufacturer JLG.