Skip to main content

World debut for Ruthmann’s T 720 truck-mounted platform

The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.
April 17, 2013 Read time: 2 mins
The Ruthmann Steiger T 720 offers flexible access at heights of up to 72m
The newest addition to 3285 Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib.
 
Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m.

Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load. The T 720’s flexibility allows work to be carried out behind obstructions, including electric cables, pipes, and building fronts.

Work can also be carried out at depths up to 12m below ground thanks to the agility of the Rüssel jib system and the telescoping and rotating features of the working cage.

Like its existing smaller siblings in the series – the T460 and T 540 – the T 720 is designed to give customers the benefits of the extra length. Ruthmann said that operators now have an extra 5.5m of upper boom length compared to previous models in this class, giving nearly 20m overall length for the upper telescoping boom system.

A new feature for Ruthmann Steiger models in this class is that the four outriggers of the T 720 can be controlled individually from the rear on both sides of the vehicle. This has been designed to facilitate better judgement when jacking and to increase safety on site. Ruthmann said that easier positioning of the outrigger pads also greatly reduces set-up time.

The T 720’s truck has compact dimensions with total vehicle length of just 13.7m.

Later this year, Ruthmann will be adding two more models to the series.   

Stand: F10.1006/4

 %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.ruthmann-steiger.com www.ruthmann-steiger.com false http://www.ruthmann-steiger.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Trimble is offering more sophisticated GNSS receivers
    March 8, 2013
    Trimble says that it is increasing the capabilities of its integrated GNSS survey receiver range. This line-up includes the Trimble R4, Trimble R6, Trimble R8 GNSS systems and is rounded out by the latest Trimble R10 GNSS System. The new improvements being added include increased satellite tracking and Real Time Kinematic (RTK) performance. These modernise the integrated receiver portfolio to add functionality, flexibility and capability as well as providing more options for surveyors.
  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • BHS-Sonthofen’s new twin-shaft mixers for dry building materials
    February 26, 2013
    BHS-Sonthofen is unveiling twin-shaft mixers of the new DMX series, which are adapted to the special requirements of mixing dry materials, such as cement, dry mortar, bonding compounds and dry shotcrete. The new mixers are specially tailored to the production of dry material mixtures, and are said to be suitable for mixtures containing all manner of aggregates, cement, small dry components, plastic fibres and cellulose. With an extensive modular system and various options, they can be customised to the prod