Skip to main content

World Bank cuts Ukraine financing

The World Bank is reducing its financing of projects in Ukraine until 2016. The new cooperation strategy between the bank and the country's government follows a drop in financing through slow spending loans extended by the bank to the country. The bank will provide US$150million for the Second Project for Exports Development in 2012. And Ukraine can also receive $1billion in 2013–2014, but both financing packages depend on development of economic reforms in the country during the following two years. The
June 14, 2012 Read time: 2 mins
The 2332 World Bank is reducing its financing of projects in Ukraine until 2016.

The new cooperation strategy between the bank and the country's government follows a drop in financing through slow spending loans extended by the bank to the country.

The bank will provide US$150million for the Second Project for Exports Development in 2012. And Ukraine can also receive $1billion in 2013–2014, but both financing packages depend on development of economic reforms in the country during the following two years.

The list of the World Bank's new financing programmes in Ukraine also includes the second project for motor road development and traffic safety; the centralised heating project; improving efficiency and upgrading the gas sector ($200-300million); the second project for electric power transmission ($200million); the second project for city infrastructure development ($200million),, and the project for the state statistical system development ($10million).

Meanwhile, in Zaporizhya, the industrial metropolis in Ukraine’s south-east, a cable-stayed bridge over Dnieper River is under construction with formwork from 203 Doka.

The multi-lane bridge is being built alongside an older viaduct and the two separate roadway slabs are cable-stayed off twin H-shaped suspension towers 150m-high.

Contractors Mostobud expect the bridge to be completed by 2013.

For more information on companies in this article

Related Content

  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Cummins to offer electrified powertrain solutions
    April 24, 2018
    Cummins has revealed its first electrified off-highway powertrain concept, which can be used to create a range-extended electrified vehicle (REEV). It follows Cummins’ recent acquisitions of Brammo and Johnson Matthey Battery Systems. “Cummins will be investing $300million over the next three years to continue organic and inorganic growth to develop a portfolio of alternative power units for the off-highway market including full electric vehicles, range-extended vehicles and plug-in hybrids,” said Julie Fur
  • Turkish highways and bridge project financing secured
    June 7, 2018
    The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance