Skip to main content

World Bank cuts Ukraine financing

The World Bank is reducing its financing of projects in Ukraine until 2016. The new cooperation strategy between the bank and the country's government follows a drop in financing through slow spending loans extended by the bank to the country. The bank will provide US$150million for the Second Project for Exports Development in 2012. And Ukraine can also receive $1billion in 2013–2014, but both financing packages depend on development of economic reforms in the country during the following two years. The
June 14, 2012 Read time: 2 mins
The 2332 World Bank is reducing its financing of projects in Ukraine until 2016.

The new cooperation strategy between the bank and the country's government follows a drop in financing through slow spending loans extended by the bank to the country.

The bank will provide US$150million for the Second Project for Exports Development in 2012. And Ukraine can also receive $1billion in 2013–2014, but both financing packages depend on development of economic reforms in the country during the following two years.

The list of the World Bank's new financing programmes in Ukraine also includes the second project for motor road development and traffic safety; the centralised heating project; improving efficiency and upgrading the gas sector ($200-300million); the second project for electric power transmission ($200million); the second project for city infrastructure development ($200million),, and the project for the state statistical system development ($10million).

Meanwhile, in Zaporizhya, the industrial metropolis in Ukraine’s south-east, a cable-stayed bridge over Dnieper River is under construction with formwork from 203 Doka.

The multi-lane bridge is being built alongside an older viaduct and the two separate roadway slabs are cable-stayed off twin H-shaped suspension towers 150m-high.

Contractors Mostobud expect the bridge to be completed by 2013.

For more information on companies in this article

Related Content

  • Major project to construct landmark Bay Bridge in California
    October 31, 2012
    Iconic California crossing will offer seismic safety – Adrian Greeman reports A unique single-span single-tower suspension bridge is the iconic centrepiece of a dramatic renewal of the eastern Bay Bridge in California, crossing from San Francisco to Oakland. Tourists in San Francisco sometimes mix up their bridges, identifying as the famous Golden Gate, the double suspension bridge which runs across the wide San Francisco Bay. These serially linked bridges in fact form the Bay Bridge east to Oakland whereas
  • Many Moroccan motorway projects now in hand
    November 11, 2014
    Morocco’s Casablanca-Rabat motorway accounts for almost 20% of motorway tolls in the country, generating US$25.16 million for Autoroutes du Maroc (ADM) in the first half of 2014, a growth of 4.1% from the previous year. With relatively low maintenance costs (mainly used for widening the road) the Casablanca-Rabat motorway is ADM's most profitable route. The 76km route is travelled by 51,000 vehicles/day, far higher than any other motorway. The Berrechid-Agadir motorway (which includes Berrechid-Marrakesh an
  • The new agile world of the construction equipment industry
    June 22, 2015
    while worldwide for 2015 a crystalball would be helpful, in Europe the sector has already listed specific priorities it wants to tackle, and among these are the upcoming emissions regulations (see separate story), external trade and access to foreign markets, and market surveillance.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl