Skip to main content

Work to start on next stretch of A100 in Berlin, Germany

The work on the construction of the next stretch of the A100 motorway in Berlin, Germany, is about to start. The project is expected to cost €473 million (US$616.72mn) and be completed by 2020.
May 16, 2013 Read time: 1 min
The work on the construction of the next stretch of the A100 motorway in Berlin, Germany, is about to start. The project is expected to cost €473 million (US$616.72mn) and be completed by 2020.

Related Content

  • Second bascule bridge for Lowestoft
    December 10, 2020
    Total cost of the North Sea coastal project is around €160 million.
  • Prenj Tunnel contract to be tendered
    July 4, 2022
    The tunnel in Bosnia will form part of the important European Corridor 5C route.
  • Koridori Srbije signs Corridor 11 motorway deal with Shandong HSG
    May 16, 2013
    Serbian Minister of Infrastructure, Velimir Ilic, and the director of the roads company Koridori Srbije, Dmitar Durovic, say they have signed a contract agreement with the Chinese company Shandong High Speed Group, for construction of the Corridor 11 motorway, worth a total of €257.23 million (US$ 334mn). The contract has been signed by Zhu Wei, deputy director of the Chinese company, for construction of the Ljig-Preljina part of 50km. Meanwhile, a new tender is due to be called soon for construction of the
  • Russian road contracts for Moscow and St Petersburg
    June 24, 2019
    Two major road projects are being planned for Russia’s first and second cities, Moscow and St Petersburg. Bidding is opening for the project to build a stretch of Moscow’s North-East Expressway. The work is expected to cost around US$780.6 million and includes building five viaducts and three bridges, as well as rebuilding the existing Novosavinovsky Bridge. Meanwhile in St Petersburg, construction work for the Eastern High-Speed Diameter (VSD) is now being held back until 2022 at the earliest. The work i