Skip to main content

Work is moving ahead on the new bridge connecting Laos and Thailand and spanning the Mekong River

Plans are well in hand for the fourth Laos-Thai Friendship Bridge connecting Laos with Thailand. The bridge is expected to be complete by 2014 and spans the Mekong River between Thailand's Chiang Rai province and Laos' Bokeo province. The two countries have also reached an agreement for the fifth Lao-Thai Friendship Bridge, which will span from Thailand's Bung Kan province to Laos' Bolikhamsay province.
April 3, 2012 Read time: 1 min
Plans are well in hand for the fourth Laos-Thai Friendship Bridge connecting Laos with Thailand. The bridge is expected to be complete by 2014 and spans the Mekong River between Thailand's Chiang Rai province and Laos' Bokeo province. The two countries have also reached an agreement for the fifth Lao-Thai Friendship Bridge, which will span from Thailand's Bung Kan province to Laos' Bolikhamsay province.

Related Content

  • New bridge works planned for the Philippines
    September 21, 2022
    Three new bridge links are planned for the Philippines.
  • Thailand’s proposed US$1.47 billion underground route
    July 25, 2024
    Thailand is proposing a US$1.47 billion underground road route.
  • New connection linking major Dutch highways
    October 21, 2014
    In the Netherlands plans are in hand for a new connection between the A50 and N279 highways. This new link will be constructed in Noord-Brabant Province. The initial plan was for a tunnel running underneath a nature reserve that would carry the four lane highway. However the cost of this option is significantly higher than the other possible solution, constructing the highway through the reserve. The latter option is preferred by the local authorities due to the cost saving but may face opposition on enviro
  • New German bridge links
    July 9, 2012
    Two border crossing bridges are being planned to link Germany with other European nations, Denmark and Luxembourg. The Danish engineering consultancy company Cowi has the contract to design a 19km bridge across the Fehmarn Belt between Denmark and Germany. Planning is expected to take three years and the project will entail major engineering challenges.