Skip to main content

Work is moving ahead on the new bridge connecting Laos and Thailand and spanning the Mekong River

Plans are well in hand for the fourth Laos-Thai Friendship Bridge connecting Laos with Thailand. The bridge is expected to be complete by 2014 and spans the Mekong River between Thailand's Chiang Rai province and Laos' Bokeo province. The two countries have also reached an agreement for the fifth Lao-Thai Friendship Bridge, which will span from Thailand's Bung Kan province to Laos' Bolikhamsay province.
April 3, 2012 Read time: 1 min
Plans are well in hand for the fourth Laos-Thai Friendship Bridge connecting Laos with Thailand. The bridge is expected to be complete by 2014 and spans the Mekong River between Thailand's Chiang Rai province and Laos' Bokeo province. The two countries have also reached an agreement for the fifth Lao-Thai Friendship Bridge, which will span from Thailand's Bung Kan province to Laos' Bolikhamsay province.

Related Content

  • Paraguay-Brazil bridge facing delay
    November 15, 2017
    Brazil’s economic woes are now affecting the construction of a new bridge connecting the country with Paraguay. The project is expected to cost US$71.34 million and the contract was awarded to Construbase-Ciudad-Paulitec and the necessary environmental permits were also given earlier in 2017. However now that Brazil is unable to provide its portion of the funds necessary, the completion date will have to wait. The bridge was to have been the second such link between the two countries and is required as the
  • China's new link to North Korea
    February 8, 2012
    China is investing in a new bridge that will link with its neighbor North Korea. The project is expected to cost in the region of US$249 million.
  • Vietnamese expressway works planned
    May 23, 2022
    New Vietnamese expressway works are being planned.
  • New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity
    September 7, 2018
    The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.