Skip to main content

Work on key section of new Oman highway cancelled

The Oman Government has cancelled work on Package Two of the Batinah Expressway project. This was for a 45km section of highway worth US$327 million. The eight lane highway was to have been built over a three year period. It is not clear when work will recommence and whether or not the original firms involved will be re-engaged but under different terms.
April 12, 2013 Read time: 1 min
The Oman Government has cancelled work on Package Two of the Batinah Expressway project. This was for a 45km section of highway worth US$327 million. The eight lane highway was to have been built over a three year period. It is not clear when work will recommence and whether or not the original firms involved will be re-engaged but under different terms.

Related Content

  • British Colombia in Canada plans major road investment
    March 20, 2015
    In Canada the British Colombia Government has announced a programme of road and highway upgrades worth a total of US$1.99 billion (C$2.5 billion). The investment will be used to rehabilitate side roads, highways and bridges across the province. This plan will include repaving some 1,000km/year of provincial highway, with this plan stretching out over a period of 10 years. A key portion of the work will be to widen Highway 1 section to six lanes between Abbotsford and Langley. The proposed plan has been titl
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Nigeria’s FEC approve road works valued at US$768.43 million
    August 22, 2013
    Nigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion). A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months. Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria
  • Atkins is working on major deals for Texas and Florida
    March 10, 2014
    Atkins is working on major contracts in Texas and Florida for tolling and design and build services respectively. In Texas the Department of Transportation (TxDOT) reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, $10 million contract, Atkins is providing planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing serv