Skip to main content

Work on Bosnian link accelerates

In Bosnia delays have affected the construction work on the country's key Corridor 5c highway project. So far 37km of the 336km Corridor 5c highway has been built, with 21km under construction and a further 43km section being cleared for work to commence.
February 27, 2012 Read time: 1 min
In Bosnia delays have affected the construction work on the country's key Corridor 5c highway project. So far 37km of the 336km Corridor 5c highway has been built, with 21km under construction and a further 43km section being cleared for work to commence. However, Bosnia's Ministry of Communications and Transport has stated that it is now taking action and is speeding up the pace of the construction works. The total cost of the project has not been revealed at this stage by the authorities however

Related Content

  • Questions and delays afflict some key Indonesian transport project
    March 28, 2014
    Indonesia’s transport expansion programme is seeing new projects commence, but others afflicted by questions over feasibility and delays. Questions over the economic feasibility of the proposed Sunda Strait Bridge project have been raised by the Public Works Ministry. This mega-project is intended to provide a road link between Sumatra and Java. But construction of the 30km structure could cost up to US$23 billion and might not be fully recovered, even if the investor collects toll fees under a 100-year con
  • Breakthrough for Bosnia’s Vranduk Tunnel
    March 7, 2022
    The twin-tube Vranduk Tunnel is being built using the new Austrian tunnel method by Azerbaijan's Azvirt and Hering dd Siroki Brijeg contractors.
  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
  • Tunisia's road strategy
    March 1, 2012
    A technical study worth US$5.9 million (€4 million) is starting for Tunisia's Kairouan-Enfidha highway.