Skip to main content

Work on Algeria’s High Plateau motorway to begin in late June 2013

Work on Algeria’s High Plateau motorway is scheduled to begin in late June 2013, it has been revealed following the conclusion of related studies. The 1,300km motorway will link Tébessa and Nâam; connect to the East-West motorway; and serve 12 regions. It is one of 11 motorways to be built as part of the five-year, US$12.55 billion (DZD 1tn) plan established by the Algerian government. There is a further priority project to connect the ports in Béjaia, Djendjen and Skikda to the East-West motorway.
April 9, 2013 Read time: 1 min
Work on Algeria’s High Plateau motorway is scheduled to begin in late June 2013, it has been revealed following the conclusion of related studies.

The 1,300km motorway will link Tébessa and Nâam; connect to the East-West motorway; and serve 12 regions. It is one of 11 motorways to be built as part of the five-year, US$12.55 billion (DZD 1tn) plan established by the Algerian government. There is a further priority project to connect the ports in Béjaia, Djendjen and Skikda to the East-West motorway.

Related Content

  • Work to restart on major Algeria link projects
    September 8, 2016
    Algeria is planning to restart construction of the final section of the country’s East- West Highway project as well as a tunnel at Djebel El Ouahch. Some 84km of the East-West highway located in Algeria’s El Tarf region remains to be built following the withdrawal of a Japanese-led consortium from the project. The project to build the 1.9km twin tube tunnel at Djebel El Ouahch and close to Constantine faced major geological challenges.
  • Algeria developing its Sahara route
    June 2, 2021
    Algeria is developing its section of the Trans-Sahara route.
  • Algeria gives go ahead for 63km Guelma-Annaba motorway
    December 11, 2014
    Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
  • Work on Algeria’s 1,000km Hauts-Plateaux motorway to begin this month
    February 26, 2014
    The Algerian Minister for Public Works, Farouk Chiali, has said that the 1,000km-long Hauts-Plateaux motorway project will begin this month, with the cost of constructing the route reaching US$8.94 billion (DZD 700 billion). Chiali said local firms will carry out the works exclusively, with the project having been divided into ten sections. Each section, requiring 36 months of work, will be attributed to a different consortium of Algerian firms. If work begins on each section at the same time, the project