Skip to main content

Wireless EV charging trial

Evatran, a developer of wireless charging systems for electric vehicles, has signed contracts with six high-profile commercial participants to outfit their Chevrolet Volt and Nissan Leaf models with pre-production Plugless Power wireless charging systems.
April 26, 2012 Read time: 1 min
3979 Evatran, a developer of wireless charging systems for electric vehicles, has signed contracts with six high-profile commercial participants to outfit their 2773 Chevrolet Volt and 2454 Nissan Leaf models with pre-production Plugless Power wireless charging systems. The product trial, termed the Apollo Launch Program, aims to drive electric vehicle (EV) adoption across the United States through the launch of a convenient charging system for electric vehicles that removes the traditional hassles of plug-in cars.

Evatran claims this trial is the first of its kind in the world, and will help to establish the United States as the EV market leader. Participants range from car rental agencies to corporate campuses to utility providers and installations will occur in locations across the United States who will provide feedback on daily usage routines, user interfaces, and any additional functionality needed.

Announcements regarding the participants of the Apollo Launch Program are planned for early January with installations beginning in February 2012. A second phase of the Program is planned for the third quarter of 2012 to include additional participants across the country.

For more information on companies in this article

Related Content

  • Manufacturers push hybrid driveline technology
    January 6, 2017
    Driveline technology continues to develop rapidly, with many manufacturers at this year’s Conexpo exhibition showing Tier 4 Final emissions solutions, along with a host of fuel saving transmissions and hydraulic systems, all aiming to reduce operating costs for the customer. However, while there was certainly a hybrid presence at the show, things haven’t perhaps moved forward as fast as many had expected.
  • Manufacturers push hybrid driveline technology
    March 11, 2014
    Driveline technology continues to develop rapidly, with many manufacturers at this year’s Conexpo exhibition showing Tier 4 Final emissions solutions, along with a host of fuel saving transmissions and hydraulic systems, all aiming to reduce operating costs for the customer. However, while there was certainly a hybrid presence at the show, things haven’t perhaps moved forward as fast as many had expected.
  • Manufacturers push hybrid driveline technology
    April 22, 2014
    Driveline technology continues to develop rapidly, with many manufacturers at this year’s Conexpo exhibition showing Tier 4 Final emissions solutions, along with a host of fuel saving transmissions and hydraulic systems, all aiming to reduce operating costs for the customer. However, while there was certainly a hybrid presence at the show, things haven’t perhaps moved forward as fast as many had expected.
  • Workzone safety protects workforce and drivers
    May 3, 2012
    Highway construction work zones are dangerous places, and anything that can improve safety is welcomed as Patrick Smith reports. The safe and efficient flow of traffic through work zones is a major concern to transportation officials, industry, the public, businesses, and commercial motor carriers. This is the view of the US Federal Highway Administration (FHWA), which has developed the Highway Work Zone Safety Program to reduce the fatalities and injurious crashes in work zones, and to enhance traffic oper