Skip to main content

Western High-Speed Diameter (WHSD) contract in St Petersburg annulled

Vice Governor of St.Petersburg Sergey Kozyrev has reported that an agreement with the Vozrozhdenie group of companies on construction of the northern section of the Western High-Speed Diameter (WHSD) can be annulled after a failure to complete the works on time. Another subcontractor is reported to be likely to complete construction of the multi-million dollar toll highway project in St Petersburg. Vozrozhdenie says delays were caused by non-payment for works already implemented. According to Vozrozhdenie,
November 6, 2012 Read time: 1 min
Vice Governor of St.Petersburg Sergey Kozyrev has reported that an agreement with the 6442 Vozrozhdenie group of companies on construction of the northern section of the Western High-Speed Diameter (WHSD) can be annulled after a failure to complete the works on time.

Another subcontractor is reported to be likely to complete construction of the multi-million dollar toll highway project in St Petersburg. Vozrozhdenie says delays were caused by non-payment for works already implemented. According to Vozrozhdenie, the authorities must address their claims to Mostootryad-19, the project’s primary contractor. The latter won a tender for construction worth US $ 446.19 million (RUB 14bn). Mostootryad-19's debt to Vozrozhdenie is reported to have reached $ 20.33 million (RUB 640mn).

For more information on companies in this article

Related Content

  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Renovating Russian route from St Petersburg region to Karelia Republic
    August 29, 2017
    Rebuilding the A-121 route connecting St Petersburg with Sortavala in the Karelia Republic will commence soon. The project is costing US$118.5 million. The work will be carried out over a 20km stretch of the highway and involves widening the roadway so that it features two lanes in either direction. Completion is expected at the end of 2019 and the work will boost the capacity on the route to over 14,000 vehicles/day. The autonomous republic of Karelia remains part of Russia and borders with Finland,
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Advances in road markings
    March 16, 2012
    Recent months have seen many major and vital road marking projects and products completed and tested in different parts of the world. Guy Woodford looks at some of them in Europe, North America, the Middle East and Africa. The London borough of Kensington and Chelsea now has one of the most dramatic streetscape designs in Europe. Exhibition Road’s striking chequered granite design, featuring a single surface running from South Kensington Station to Hyde Park and the full width of the road from building to b