Skip to main content

Wacker Neuson starts construction of R&D works in Reichertshofen

Work has started on a €10 million expansion of Wacker Neuson’s light equipment production site in the Bavarian town of Reichertshofen, near Munich, southern Germany. The result with be a new R&D centre for light equipment that is set to open early next year. A silver-spade ceremony was held on April 22, 2016, and the first employees will be moving into the four-story administration building and test hall by the end of the year.
April 26, 2016 Read time: 2 mins
Turning over a new leaf at Wacker Neuson’s Reichertshofen site.

Work has started on a €10 million expansion of 1651 Wacker Neuson’s light equipment production site in the Bavarian town of Reichertshofen, near Munich, southern Germany.

The result with be a new R&D centre for light equipment that is set to open early next year.

A silver-spade ceremony was held on April 22, 2016, and the first employees will be moving into the four-story administration building and test hall by the end of the year.

In the coming year, Wacker Neuson will move its R&D, product management and materials management to Reichertshofen near to the production facility.

Wacker Neuson employs around 330 people employees at the Reichertshofen 10 ha site. The company is constructing an office building and test hall next to the production facilities. This will include around 3,500m2 for up to 120 employees, primarily in R&D. Adjacent to this will be a large, modern test hall providing almost 3,000m2 of space for extensive testing of light equipment during the development phase.

“Moving all technical operations for light equipment to the same site will improve processes, shorten workflows and boost productivity even further,” said Helmut Bauer, managing director of Wacker Neuson Produktion, based in Germany.

Vibratory plates, various rammers such as battery-powered rammers, internal vibrators and inverters, angle grinders, floor saws and breakers will be developed and manufactured at the Reichertshofen site.

For more information on companies in this article

Related Content

  • The upcoming bauma 2013 event looks set to beat records
    May 21, 2012
    The organisers of the bauma 2013 exhibition in Munich have revealed that 11 months before the show is due to open, all stand space has been sold. This is despite the fact that the exhibition space has been extended to a record 570,000m2. Organised by Messe München, the International Trade Fair for Construction Machinery, Building Material Machines, Mining Machines, Construction Vehicles and Construction Equipment now has a waiting list for all of its sections. Located in the Bavarian capital Munich, this is
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Tools for breaking
    February 9, 2012
    Mike Woof reports on equipment developments in the demolition sector. The hydraulic hammer is a tough tool used in a wide array of demolition jobs. Highly versatile, the breaker has evolved from a simple design based on rockdrilling equipment into a sophisticated and reliable piece of machinery. German firm Krupp and French company Montabert were pioneers of the hydraulic breaker, being followed into the market by a growing array of other manufacturers. Early breakers had the unfortunate habit of tearing th
  • Less edge spalling and a perfect joint pattern with Bomag
    June 27, 2023
    The BPR 60/65 D STONEGUARD paving plate builds quality.