Skip to main content

Wacker Neuson adds to telehandler range

Wacker Neuson has added two compact telescopic handlers to its range – the TH412 and the TH625. The machines offer maximum heights of 4.31m and 5.73m respectively, with lift capacities of 1.2tonnes and 2.5tonnes. Despite their compact dimensions they retain large telescopic-handler design features, such as all-wheel steering and generously-sized cabs, standard on the TH625 and optional on the smaller model. The two loaders are equipped with Wacker’s VLS vertical lift system, which avoids overloading throug
January 6, 2017 Read time: 2 mins
High performance with compact dimensions
1651 Wacker Neuson has added two compact telescopic handlers to its range – the TH412 and the TH625.  The machines offer maximum heights of 4.31m and 5.73m respectively, with lift capacities of 1.2tonnes and 2.5tonnes.

Despite their compact dimensions they retain large telescopic-handler design features, such as all-wheel steering and generously-sized cabs, standard on the TH625 and optional on the smaller model.

The two loaders are equipped with Wacker’s VLS vertical lift system, which avoids overloading through longitudinal tipping. In bucket mode the system automatically retracts the telescopic arm as the boom is lowered. The ratio of retraction to lowering is designed so that the machine does not enter into an overload situation, even at maximum payload.

In stacking mode the telescopic arm first retracts upon reaching an overload situation. Retraction stops as soon as there is no longer an overload. If the boom angle is greater than 40 degrees, the arm is retracted as in bucket mode during lowering. This ensures that the machines remain in a safe working position whatever the situation.

Stand: F9.909

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 46073 0 oLinkExternal www.WackerNeuson.com www.WackerNeuson.com false /EasySiteWeb/GatewayLink.aspx?alId=46073 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Lintec showcases redesigned CSD 1500 plant at bauma
    February 12, 2013
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
  • Perkins completes line-up of four-cylinder engines for Tier IV Final/Stage 4
    January 6, 2017
    Perkins has completed its line-up of four-cylinder engines for Tier 4 Final/Stage IV with the introduction of the 854F-E34TA – the latest in its 800 Series range. The compact, four-cylinder, 3.4litre engine incorporates specially developed SCR technology for the first time. Packaged separately from the DOC module, it can be mounted in either a horizontal or vertical position, giving OEMs of compact machinery greater installation flexibility in the engine bay.
  • Perkins completes line-up of four-cylinder engines for Tier IV Final/Stage 4
    April 16, 2013
    Perkins has completed its line-up of four-cylinder engines for Tier 4 Final/Stage IV with the introduction of the 854F-E34TA – the latest in its 800 Series range. The compact, four-cylinder, 3.4litre engine incorporates specially developed SCR technology for the first time. Packaged separately from the DOC module, it can be mounted in either a horizontal or vertical position, giving OEMs of compact machinery greater installation flexibility in the engine bay.
  • Five things road construction crews should not do
    June 19, 2015
    Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.