Skip to main content

Wacker Neuson adds to telehandler range

Wacker Neuson has added two compact telescopic handlers to its range – the TH412 and the TH625. The machines offer maximum heights of 4.31m and 5.73m respectively, with lift capacities of 1.2tonnes and 2.5tonnes. Despite their compact dimensions they retain large telescopic-handler design features, such as all-wheel steering and generously-sized cabs, standard on the TH625 and optional on the smaller model. The two loaders are equipped with Wacker’s VLS vertical lift system, which avoids overloading throug
January 6, 2017 Read time: 2 mins
High performance with compact dimensions
1651 Wacker Neuson has added two compact telescopic handlers to its range – the TH412 and the TH625.  The machines offer maximum heights of 4.31m and 5.73m respectively, with lift capacities of 1.2tonnes and 2.5tonnes.

Despite their compact dimensions they retain large telescopic-handler design features, such as all-wheel steering and generously-sized cabs, standard on the TH625 and optional on the smaller model.

The two loaders are equipped with Wacker’s VLS vertical lift system, which avoids overloading through longitudinal tipping. In bucket mode the system automatically retracts the telescopic arm as the boom is lowered. The ratio of retraction to lowering is designed so that the machine does not enter into an overload situation, even at maximum payload.

In stacking mode the telescopic arm first retracts upon reaching an overload situation. Retraction stops as soon as there is no longer an overload. If the boom angle is greater than 40 degrees, the arm is retracted as in bucket mode during lowering. This ensures that the machines remain in a safe working position whatever the situation.

Stand: F9.909

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 46073 0 oLinkExternal www.WackerNeuson.com www.WackerNeuson.com false /EasySiteWeb/GatewayLink.aspx?alId=46073 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of