Skip to main content

Volvo’s new pavers have perkier performance

The latest tracked asphalt pavers from Volvo Construction Equipment get independent travel drives and electronic traction control to help maintain productivity on slopes and around corners. The P8820C ABG can pave widths from 2.5m up to 13m and handle 1,100tonnes/hour, while the P7820C ABG paves up to 11m and places up to 900tonnes/hour.
January 6, 2017 Read time: 2 mins
The new pavers from Volvo are more powerful and productive than their predecessors
%$Linker: 2 Internal 2 4802 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">RSS</span></span> Road Paving and Recycling false /event-news/intermat-2012/rss/road-paving-and-recycling/ true false%>The latest tracked asphalt pavers from 2394 Volvo Construction Equipment get independent travel drives and electronic traction control to help maintain productivity on slopes and around corners.

The P8820C ABG can pave widths from 2.5m up to 13m and handle 1,100tonnes/hour, while the P7820C ABG paves widths up to 11m and places up to 900tonnes/hour.

For Europe the pavers come with Volvo’s latest Stage IIIB-compliant six-cylinder D8 engine delivering 175kW in the P7820C and 200kW in the P8820C. In most operating conditions the Smart Power system reduces engine power and speed, resulting in fuel savings of up to 30% as well as halving noise levels.

The operator’s central control panel can be swivelled, tilted and extended and houses the Electronic Pavers Management II system (EPM II), which controls the paving processes.
Wide rubber clad crawler tracks have individual (electronically controlled) drives and the electronics system monitors track movement and controls motor response for accurate straight line and fixed radius work.

EPM II’s Settings Manager allows operators to save settings for future recall when similar conditions are encountered and thereby reduce set-up time. The electronic system also monitors fuel consumption and alerts the operator when maintenance is due.

%$Linker: External 0 0 0 oLinkExternal www.volvoce.com Volvo false http://www.volvoce.com/ false false%>

Hall: 6 Stand: C041

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Fayat Group launches piling clamp at INTERMAT
    January 6, 2017
    Fayat Group has developed the Tiltex swivelling clamp for sheet pile handling. Specifically designed for excavator-mounted Vibrodrivers, the Tiltex clamp improves the handling of sheet piles and the productivity on piling projects.
  • Fayat Group launches piling clamp at INTERMAT
    March 9, 2012
    Fayat Group has developed the Tiltex swivelling clamp for sheet pile handling. Specifically designed for excavator-mounted Vibrodrivers, the Tiltex clamp improves the handling of sheet piles and the productivity on piling projects.
  • Lintec presents new Gussasphalt plant for the European Market
    January 6, 2017
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • Lintec presents new Gussasphalt plant for the European Market
    April 12, 2012
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw