Skip to main content

Volvo CE’s Russian Revolution

Volvo Construction Equipment has started its own Russian revolution by beginning work on its US$52million excavator factory in Kaluga. High profile dignitaries, including Kaluga Region governor Anatoly Artamonov and president of Volvo CE Pat Olney, attended a special ceremony on April 18 to mark the start of the groudbreaking project.
April 19, 2012 Read time: 2 mins
RSSVolvo Construction Equipment has started its own Russian revolution by beginning work on its US$52million excavator factory in Kaluga.

High profile dignitaries, including Kaluga Region governor Anatoly Artamonov and president of 359 Volvo CE Pat Olney, attended a special ceremony on April 18 to mark the start of the groudbreaking project.

The 15 hectare site, around 150km south-west of Moscow, is said by Volvo CE to underscore the company’s commitment to the Russian market. It will be Volvo’s seventh excavator manufacturing facility, out of a total of 16 plants globally. When completed, the final manufacturing area will be 20,660m2. Six models of excavators are planned to be made at the plant, ranging from the 20-tonne EC200 to the 48-tonne EC480. The first machines are due off the assembly lines next year – creating 280 new jobs in the process.

A leading player in the Russian market, Volvo CE plans to double sales in the country by 2015. As part of this aim, Volvo CE’s new Russian dealer 5066 Ferronordic Machines plans to increase its branches from 55 to 100 locations by 2015.

For more information on companies in this article

Related Content

  • UAE mountain road construction complete
    January 5, 2017
    An eight year project to construct the highest road in the UAE is now complete, with key help having been provided by a fleet of Volvo CE machines The work was carried out by local contractor General Mechanic Company (GMC), with assistance from Volvo CE dealer FAMCO as well as Volvo CE itself and Volvo Trucks. The 36km road climbs 1,910m to its highest point in a mountain range and required the transportation of 5.5 million m3 of materials during its construction.
  • New bypass for Meghalaya, India
    November 21, 2014
    A new two-lane road has been built in Meghalaya, India, providing a challenging project for the construction team The new road lies at a comparatively high altitude and provides a bypass around Shillong, the capital of Meghalaya and which is one of the smallest states in India. Shillong is located 1,496m above sea level, with the highest point being Shillong Peak at almost 2,000m, and the area has a much cooler climate than the rest of tropical India. Shillong is also only 55km away from Mawsynram, which is
  • Construction sector's quiet revolution for digital worksites
    February 8, 2017
    The digital worksite topped the agenda at this year’s CECE congress. David Arminas reports from the Czech capital Prague* Europe’s equipment manufacturers and their clients are truly in an age of transformation driven by an increasing move towards the digital worksite. Because this transformation is so deep, there looms big challenges for the entire sector and its supply chain, noted Bernd Holz, president of the CECE – Committee for European Construction Equipment, Europe’s umbrella organisation for
  • LiuGong loaders successful in Thailand
    October 3, 2014
    LiuGong claims to have retained its market leader position as Thailand’s top wheeled loader provider for the third consecutive year. The manufacturing juggernaut for extreme duty equipment entered the Thai market in 2011 and has sold 1,500 wheeled loaders in three years. President of LiuGong Machinery Asia Pacific Mr Chen Hao attributed the success to the brand’s consistent focus in understanding the wheeled loader industry’s needs and delivering products that are innovative, reliable and durable. L