Skip to main content

Volgograd authorities to allot over US$231 million for roads in 2013

The Volgograd region (South) authorities will allot over US$231 million (RUB 7bn) for roads in 2013. A total of $82.64 million will be provided for construction, about $92.56 million for repairing and maintaining regional road facilities.
January 23, 2013 Read time: 1 min
The Volgograd region (South) authorities will allot over US$231 million (RUB 7bn) for roads in 2013. A total of $82.64 million will be provided for construction, about $92.56 million for repairing and maintaining regional road facilities.

Related Content

  • US transportation plan being developed?
    February 24, 2015
    In the US, the Obama administration is beginning work on a 30-year transportation plan to meet US infrastructure needs. Transportation Secretary Anthony Foxx, commented in an interview with the Washington Post. “Transportation is a system of systems,” Foxx said, rather than the aggregate of separate systems that can be addressed individually. “The idea that we’re looking at the system comprehensively is the thrust of this report.” He said the report, which will be followed by a formal comment period, is int
  • Minnesota's key road plans
    February 16, 2012
    The US state of Minnesota has plans for a total of 258 road construction and improvement projects in hand.
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • Nigeria’s FEC approve road works valued at US$768.43 million
    August 22, 2013
    Nigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion). A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months. Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria