Skip to main content

Vögele is offering a paver configured for Chinese needs

The Vögele Super 1800-2 HD paver has been configured specifically for Chinese market needs. This model features an SB300HD fixed screed that features special wear plating in key areas and can be used for placing roadbase or cement-treated base, laying up to 700tonnes/hour. The chassis is slightly longer than the standard model Super 1800-2 model and its hopper is modified with a lower feed height to allow loading by the wide range of trucks used in China. Its push rollers can also be moved to reduce impact
November 29, 2012 Read time: 1 min
Vögele is offering a heavy duty version of its well-proven Super 1800-2 paver aimed at use in the Chinese market for laying roadbase
The 1194 Vögele Super 1800-2 HD paver has been configured specifically for Chinese market needs. This model features an SB300HD fixed screed that has special wear plating in key areas and can be used for placing roadbase or cement-treated base, laying up to 700tonnes/hour. The chassis is slightly longer than the standard model Super 1800-2 model and its hopper is modified with a lower feed height to allow loading by the wide range of trucks used in China. Its push rollers can also be moved to reduce impact forces when a truck reverses into the paver for loading of the hopper. Power comes from a 299 Perkins diesel rated at 129.6kW.

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 44492 0 oLinkExternal www.vogele.com www.vogele.com false /EasySiteWeb/GatewayLink.aspx?alId=44492 true false%>

For more information on companies in this article

Related Content

  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Allen’s diverse array of concrete machines
    January 6, 2017
    Concrete specialist Allen Engineering is highlighting it diverse product range at Conexpo, with some of its latest models on show. One of the firm’s key products is its proven Triple Roller Tube with gang vibrators, while another is the RS844 Roller Screed. Allen Engineering offers units for bridge construction and is exhibiting its versatile Bridge Deck Finisher.
  • Allen’s diverse array of concrete machines
    January 20, 2014
    Concrete specialist Allen Engineering is highlighting it diverse product range at Conexpo, with some of its latest models on show. One of the firm’s key products is its proven Triple Roller Tube with gang vibrators, while another is the RS844 Roller Screed. Allen Engineering offers units for bridge construction and is exhibiting its versatile Bridge Deck Finisher.