Skip to main content

Vietnam’s road programme gearing up

Vietnam’s impressive road development programme is now gearing up, with a series of major projects scheduled to commence in 2019. Work is starting on three key projects: the My Thuan 2 Bridge; the Cam Lo to La Son highway section; the Cao Bo to Mai Son highway section. All three of these projects will form part of the Eastern North-South Expressway, with the work being overseen by the Ministry of Transport (MOT). The My Thuan 2 Bridge will cost some US$214.3 million and will connect Vinh Long Province with
January 7, 2019 Read time: 2 mins

Vietnam’s impressive road development programme is now gearing up, with a series of major projects scheduled to commence in 2019. Work is starting on three key  projects: the My Thuan 2 Bridge; the Cam Lo to La Son highway section; the Cao Bo to Mai Son highway section. All three of these projects will form part of the Eastern North-South Expressway, with the work being overseen by the Ministry of Transport (MOT). The My Thuan 2 Bridge will cost some US$214.3 million and will connect Vinh Long Province with Tien Giang Province, with work commencing in mid-2019. Costing $330 million the 98.3km stretch of highway from Cam Lo to La Son will link Quang Tri Province with Thua Thien-Hue Province Province and construction work will start in the second quarter of 2019. The tender process for the Cao Bo to Mai Son highway section is being opened in April 2019, with winner being selected and construction then expected  to start in mid-July 2019.

A number of highway upgrade projects are also being planned by the MOT, including work to the Lanh-Hong Ngu stretch of National Highway 30 and to the Quan Lo-Phung Hiep Road.

Related Content

  • Vietnam’s North-South highway section given go-ahead
    September 21, 2018
    The Vietnamese Government has given the go-ahead for work on a key section of the country’s North-South highway project. This 7.5km stretch of the route will run between District 2's National Highway 22 and Hiep Phuoc Industrial Park. The work will cost US$365.4 million to carry out as it includes building the Phuoc Kieng, No 1, Rach Dia and Ba Chiem bridges. Located just to the south of Ho Chi Minh City, the Hiep Phuoc Industrial Park is in a delta area, which will require the construction of the bridge se
  • Vietnam coast road planned for Ben Tre Province
    March 2, 2023
    A new coast road is planned for Vietnam’s Ben Tre Province.
  • Vietnam expressway deal progressing
    June 14, 2018
    Plans for Vietnam’s North-South expressway are progressing, with work moving ahead for key portions of the route’s eastern spur. A feasibility study has been carried out for the 29km Nha Trang-Cam Lam stretch, which is planned as a PPP project and is expected to cost around US$225 million. Feasibility studies for a further five portions of the North-South expressway are being carried out and should be ready shortly, with three feasibility studies already having been accepted in May 2018. Construction work f
  • Vietnam road infrastructure plans
    February 4, 2019
    New road and bridge links are being opened to drivers in Vietnam, boosting connectivity and transport for the country. The 60km Ha Long-Van Don expressway in Quang Ninh is now open to traffic, having cost around US$514.4 million to construct. The Ha Long-Van Don expressway links the Ha Long - Hai Phong - Hanoi expressway with Van Don Airport and was built by the BOT Bien Cuong Joint Stock Company. And the 47km road stretch connecting the Hanoi-Haiphong and Cau Gie-Ninh Binh expressways is also now open to