Skip to main content

Vietnam pushes ahead with road programme

Plans are in hand for a groundbreaking ceremony on Vietnam's Ben Luc-Long Than expressway during July-September 2011.
February 29, 2012 Read time: 2 mins
Plans are in hand for a groundbreaking ceremony on Vietnam's Ben Luc-Long Than expressway during July-September 2011. The project is expected to cost in the region of $1.6 billion, with $337 million for people's relocation and site clearance coming from Vietnam's Government.

Meanwhile the 2416 Japan International Cooperation Agency will provide an investment of $635 million. The 943 Asian Development Bank (ADB) will loan $635 million for the 57.8km expressway. The work on the highway will take four years. In addition, work is now to proceed on the Tan Son Nhat-Binh Loi road project in Vietnam. Financing from the Xi Grand Court project will be transferred to the development of Tan Son Nhat-Binh Loi outer road (TSB road).

Approval from the government for South Korea's GS Engineering & Construction to transfer the project has been conveyed by the Ho Chi Minh City's People's Committee. The beltway will be able to connect Thu Duc district with Tan Son Nhat airport. Initially, GS Engineering & Construction was supposed to provide US$340 million for the beltway.

Meanwhile 2560 Vietnam's Ministry of Transport will be working with 3383 Korea Eximbank on several transport infrastructure projects. The loans include $100 million for the Vinh Thinh bridge project, $200 million for the Vam Cong bridge project and $120 million to build the southern coastal corridor road route.

For more information on companies in this article

Related Content

  • Transport plans for Indonesia
    November 28, 2012
    Indonesia’s Government is setting a US$20 billion budget for transport and energy sector development. The Indonesian Government plans to build 559km of new roads as part of a new transport infrastructure programme. Indonesia’s capital Jakarta faces a growing problem due to severe traffic congestion, which is particularly intense at peak periods. Increasing vehicle numbers in the city mean that the existing traffic problem is fast getting worse. The authorities are looking at policies to address the issue.
  • Prequalification tender for Oman carriageway project floated
    June 13, 2013
    The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
  • World Bank to reduce its Ukraine financing
    April 24, 2012
    The World Bank is reducing its financing projects in Ukraine until 2016. The new cooperation strategy between the bank and the country's government follows a drop in financing through slow spending loans extended by the bank to the country in recent years. The bank will provide US$150million for the Second Project for Exports Development in 2012. And Ukraine can also receive $1billion in 2013-2014. However, both financing packages will depend on development of economic reforms in the country during the foll
  • Construction equipment launched at Bauma China
    February 15, 2012
    The 2010 bauma China event did, as expected, break all previous records, with companies launching more new equipment than ever. Patrick Smith reports. The queues at the entrances on the first day of bauma China 2010 indicated what the rest of the week had in store. As thousands of visitors poured through the gates each day to view the latest in construction equipment at the expanded Shanghai New International Expo Centre, the organisers knew they were looking at another successful event.