Skip to main content

VIDEO: A sinking feeling in Florence

Be careful where you park your car in Florence, Italy. Might be best to not leave your vehicle next to the River Arno. In this case, 20 drivers returned to their cars only to find them sitting in a 6.5m deep sinkhole next to the river. The ‘hole’ appeared after what media reports said was a water main burst that flooded the road’s substructure, dropping nearly 200m of pavement into rushing water from the ruptured pipe. Vehicles remained out of the river, thanks to a brick wall. Nobody was injured in the
May 27, 2016 Read time: 2 mins
Be careful where you park your car in Florence, Italy. Might be best to not leave your vehicle next to the River Arno.

In this case, 20 drivers returned to their cars only to find them sitting in a 6.5m deep sinkhole next to the river.

The ‘hole’ appeared after what media reports said was a water main burst that flooded the road’s substructure, dropping nearly 200m of pavement into rushing water from the ruptured pipe. Vehicles remained out of the river, thanks to a brick wall.

Nobody was injured in the collapse and emergency crews quickly began the cleanup of the area that leads up to the city’s iconic Ponte Vecchio. Tourists were quick to capitalise on the sight by taking ‘selfies’ with the sunken parking area in the background.

Related Content

  • Foiled by foliage
    September 5, 2022
    The fight against air pollutants along inner-city roads is growing, literally, as explained by Richard Sabin, managing director of Biotecture*
  • Concrete paving in Indiana
    April 2, 2021
    Important concrete paving work has been carried out in Indiana on key highway connections
  • Fast bridge building in Tennessee
    July 5, 2016
    The Tennessee Department of Transportation (TDOT) recently completed the Fast Fix 8 bridge project in Nashville, with help from a Power Curbers slipformer belonging to Irwin Concrete Construction. TDOT’s goal was to replace eight ageing interstate bridges along Interstate 40 through Nashville using a process called Accelerated Bridge Construction (ABC). This uses fast-paced, around-the-clock work to limit road closures and speed up bridge completion, impacting surrounding communities as little as possibl
  • Innovative formwork beats bridge design challenges
    February 14, 2012
    Companies are coming up with innovative formwork solutions to overcome "challenging" designs for bridges. Patrick Smith reports