Skip to main content

VIDEO: Queens University Belfast set record with Meccano bridge

A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.
October 8, 2015 Read time: 2 mins
Official Guinness World Records adjudicator Fortuna Burke, Meccanoid and Danny McPolin
A British university’s Big Bridge Build project has set a world record for the largest Meccano structure.

Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock.

The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.

Officials from Guinness World Records confirmed the bridge as the world’s largest Meccano structure.

Academics and students cooperated to design and build the bridge, with the help of local school children. The project is part of the university’s programme to encourage more children to think about careers in science, technology, engineering and mathematics.
 
The project was made possible with the help of Spin Master Corp, owner and producer of Meccano, as well as UK construction company McLaughlin & Harvey and also Aecom which advised the students as well as assisted with the construction of the bridge.

“With a growing skill shortage in Civil engineering, we hope that our work will encourage more children to consider the study of civil engineering at university level,” said Danny McPolin, senior structures lecturer at the School of Planning.

“It’s wonderful to see young people getting excited by the fantastic opportunities civil engineering can offer,” said Paul McCormick, managing director, Highways & Bridges, EMEA & India at Aecom. “We hope this event inspires more young people to and pursue careers in engineering.”

The Guinness World Record ‘Big Bridge Build’ in numbers!

Length of Bridge - 28.5m (96ft)
Longest Span of Bridge - 14m
Height of Bridge - 6m (26ft)
Weight - 600kg
Pieces of Meccano – 11,000
Nuts, bolts, washers – 60,000
Total length of Meccano pieces (laid end-to-end) – just over 3.8km

Further information, including more videos, about the bridge is available on the Guinness World Records %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal website Visit a video page false http://www.guinnessworldrecords.com/news/2015/9/bridge-made-out-of-10-000-meccano-pieces-earns-record-for-queen%E2%80%99s-university-stud-397931 false false%>.

Related Content

  • Geneva has a strong partnership with Birmingham University in the UK
    March 28, 2014
    IRF Geneva's longstanding partnership with the University of Birmingham has been expanded to form one of the sector’s most comprehensive professional development programmes IRF Geneva offers a rich palette of educational and professional development opportunities and resources. Programmes range from scholarships for master degree studies to the regular organisation of targeted vocational training workshops. A full listing can be accessed via the ‘training & services’ section of the IRF Geneva website (www.i
  • Cummins meeting Stage IV/Tier 4 Final with extended range of engines
    January 6, 2017
    The Cummins Engine stand this year’s Bauma will be dominated by one of the largest engines at the show, alongside one of the smallest. The firm will show a 37kW (49hp) 2.8-litre QSF2.8 alongside its giant QSK95, which delivers 3,130kW (4,200hp). These two engine highlight extensions to both ends of the Cummins offering, one of the broadest in the industry that is capable of meeting the coming Stage IV/Tier 4 Final emissions legislation.
  • Cummins meeting Stage IV/Tier 4 Final with extended range of engines
    February 7, 2013
    The Cummins Engine stand this year’s Bauma will be dominated by one of the largest engines at the show, alongside one of the smallest. The firm will show a 37kW (49hp) 2.8-litre QSF2.8 alongside its giant QSK95, which delivers 3,130kW (4,200hp). These two engine highlight extensions to both ends of the Cummins offering, one of the broadest in the industry that is capable of meeting the coming Stage IV/Tier 4 Final emissions legislation.
  • Brazil: contractors fear more layoffs as DNIT fails to pay up
    November 25, 2014
    The head of Brazil’s association of road constructors has warned of more layoffs unless the National Department of Infrastructure and Transport (DNIT) starts paying its contractors. Jose Alberto Pereira Ribeiro, president of ANEOR – National Association of Road Works - said companies already have been forced to lay off around 1,700 workers in light of non-payment by the government. Another 950 employees are on forced holidays. Ribeiro claimed DNIT failed to meet its financial obligations for September