Skip to main content

VIDEO: Queens University Belfast set record with Meccano bridge

A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.
October 8, 2015 Read time: 2 mins
Official Guinness World Records adjudicator Fortuna Burke, Meccanoid and Danny McPolin
A British university’s Big Bridge Build project has set a world record for the largest Meccano structure.

Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock.

The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.

Officials from Guinness World Records confirmed the bridge as the world’s largest Meccano structure.

Academics and students cooperated to design and build the bridge, with the help of local school children. The project is part of the university’s programme to encourage more children to think about careers in science, technology, engineering and mathematics.
 
The project was made possible with the help of Spin Master Corp, owner and producer of Meccano, as well as UK construction company McLaughlin & Harvey and also Aecom which advised the students as well as assisted with the construction of the bridge.

“With a growing skill shortage in Civil engineering, we hope that our work will encourage more children to consider the study of civil engineering at university level,” said Danny McPolin, senior structures lecturer at the School of Planning.

“It’s wonderful to see young people getting excited by the fantastic opportunities civil engineering can offer,” said Paul McCormick, managing director, Highways & Bridges, EMEA & India at Aecom. “We hope this event inspires more young people to and pursue careers in engineering.”

The Guinness World Record ‘Big Bridge Build’ in numbers!

Length of Bridge - 28.5m (96ft)
Longest Span of Bridge - 14m
Height of Bridge - 6m (26ft)
Weight - 600kg
Pieces of Meccano – 11,000
Nuts, bolts, washers – 60,000
Total length of Meccano pieces (laid end-to-end) – just over 3.8km

Further information, including more videos, about the bridge is available on the Guinness World Records %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal website Visit a video page false http://www.guinnessworldrecords.com/news/2015/9/bridge-made-out-of-10-000-meccano-pieces-earns-record-for-queen%E2%80%99s-university-stud-397931 false false%>.

Related Content

  • VIDEO captures unloved, unowned Reynolds Bridge reduced to rubble
    May 18, 2015
    There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge. It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s. Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck
  • New cone crusher from Telsmith
    April 19, 2013
    Telsmith, a member of the Astec group of companies, has launched the new Telsmith 300 cone crusher. The Telsmith 300 has a number of key features such as hydraulic overload protection, chamber clearing, push-button adjustment, and Telsmith’s exclusive anti-spin system. The cone crusher features the Telsmith Trac10 series automated control system, which provides automated calibration and setting control, protecting the crusher from overload and enhancing performance and efficiency. Trac10 continuously monito
  • EcoView module boosts plant efficiency at Intermat
    January 6, 2017
    For those who have ever wondered just how efficient their plant might be, Ammann can now provide the answer with its EcoView module for the AS1 control system. It shows - at a glance - how efficiently the mixing plant is working, by continuously recording operating data and presenting it in a condensed form to the mixing engineer. The system makes the ecological aspect of the mixing process transparent on a continuous basis by recording all the relevant energy-related data such as fuel and electrical energy
  • EcoView module boosts plant efficiency at Intermat
    April 12, 2012
    For those who have ever wondered just how efficient their plant might be, Ammann can now provide the answer with its EcoView module for the AS1 control system. It shows - at a glance - how efficiently the mixing plant is working, by continuously recording operating data and presenting it in a condensed form to the mixing engineer. The system makes the ecological aspect of the mixing process transparent on a continuous basis by recording all the relevant energy-related data such as fuel and electrical energy