Skip to main content

VIDEO: Queens University Belfast set record with Meccano bridge

A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.
October 8, 2015 Read time: 2 mins
Official Guinness World Records adjudicator Fortuna Burke, Meccanoid and Danny McPolin
A British university’s Big Bridge Build project has set a world record for the largest Meccano structure.

Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock.

The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.

Officials from Guinness World Records confirmed the bridge as the world’s largest Meccano structure.

Academics and students cooperated to design and build the bridge, with the help of local school children. The project is part of the university’s programme to encourage more children to think about careers in science, technology, engineering and mathematics.
 
The project was made possible with the help of Spin Master Corp, owner and producer of Meccano, as well as UK construction company McLaughlin & Harvey and also Aecom which advised the students as well as assisted with the construction of the bridge.

“With a growing skill shortage in Civil engineering, we hope that our work will encourage more children to consider the study of civil engineering at university level,” said Danny McPolin, senior structures lecturer at the School of Planning.

“It’s wonderful to see young people getting excited by the fantastic opportunities civil engineering can offer,” said Paul McCormick, managing director, Highways & Bridges, EMEA & India at Aecom. “We hope this event inspires more young people to and pursue careers in engineering.”

The Guinness World Record ‘Big Bridge Build’ in numbers!

Length of Bridge - 28.5m (96ft)
Longest Span of Bridge - 14m
Height of Bridge - 6m (26ft)
Weight - 600kg
Pieces of Meccano – 11,000
Nuts, bolts, washers – 60,000
Total length of Meccano pieces (laid end-to-end) – just over 3.8km

Further information, including more videos, about the bridge is available on the Guinness World Records %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal website Visit a video page false http://www.guinnessworldrecords.com/news/2015/9/bridge-made-out-of-10-000-meccano-pieces-earns-record-for-queen%E2%80%99s-university-stud-397931 false false%>.

Related Content

  • Lighter ESCO lip system offer 19% more useable wear metal
    January 6, 2017
    Wear parts specialist ESCO is using Bauma to show its new Nemisys lip system which has been engineered to deliver a lighter weight lip better sized and suited to modern buckets. The lip’s streamlined profile optimises production, says ESCO, and machine working cycles. A clever new hammerless tooth and shroud system helps reduce maintenance costs through improved reliability, faster and safer replacement, and improved lip coverage. The slim lip design and matching tooth system require 10% less force to penet
  • Lighter ESCO lip system offer 19% more useable wear metal
    February 15, 2013
    Wear parts specialist ESCO is using Bauma to show its new Nemisys lip system which has been engineered to deliver a lighter weight lip better sized and suited to modern buckets. The lip’s streamlined profile optimises production, says ESCO, and machine working cycles. A clever new hammerless tooth and shroud system helps reduce maintenance costs through improved reliability, faster and safer replacement, and improved lip coverage. The slim lip design and matching tooth system require 10% less force to penet
  • Doka chalks up sales revenue success
    January 6, 2017
    Globally renowned Austrian formwork company Doka has almost tripled its sales revenue in the last 12 years and is aiming for greater success in 2013, according to Group chairman Josef Kurzmann. Kurzmann said the firm recorded sales revenue of €853million in 2012, compared to €326million in 2000. Additionally, the percentage of non-European sales revenue accrued by Doka had increased from 6% in 2000 to 42% in 2012. To achieve further sales revenue growth, Kurzmann said Latin America, North America and India
  • Doka chalks up sales revenue success
    April 18, 2013
    Globally renowned Austrian formwork company Doka has almost tripled its sales revenue in the last 12 years and is aiming for greater success in 2013, according to Group chairman Josef Kurzmann. Kurzmann said the firm recorded sales revenue of €853million in 2012, compared to €326million in 2000. Additionally, the percentage of non-European sales revenue accrued by Doka had increased from 6% in 2000 to 42% in 2012. To achieve further sales revenue growth, Kurzmann said Latin America, North America and India