Skip to main content

VIDEO: Queens University Belfast set record with Meccano bridge

A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.
October 8, 2015 Read time: 2 mins
Official Guinness World Records adjudicator Fortuna Burke, Meccanoid and Danny McPolin
A British university’s Big Bridge Build project has set a world record for the largest Meccano structure.

Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock.

The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.

Officials from Guinness World Records confirmed the bridge as the world’s largest Meccano structure.

Academics and students cooperated to design and build the bridge, with the help of local school children. The project is part of the university’s programme to encourage more children to think about careers in science, technology, engineering and mathematics.
 
The project was made possible with the help of Spin Master Corp, owner and producer of Meccano, as well as UK construction company McLaughlin & Harvey and also Aecom which advised the students as well as assisted with the construction of the bridge.

“With a growing skill shortage in Civil engineering, we hope that our work will encourage more children to consider the study of civil engineering at university level,” said Danny McPolin, senior structures lecturer at the School of Planning.

“It’s wonderful to see young people getting excited by the fantastic opportunities civil engineering can offer,” said Paul McCormick, managing director, Highways & Bridges, EMEA & India at Aecom. “We hope this event inspires more young people to and pursue careers in engineering.”

The Guinness World Record ‘Big Bridge Build’ in numbers!

Length of Bridge - 28.5m (96ft)
Longest Span of Bridge - 14m
Height of Bridge - 6m (26ft)
Weight - 600kg
Pieces of Meccano – 11,000
Nuts, bolts, washers – 60,000
Total length of Meccano pieces (laid end-to-end) – just over 3.8km

Further information, including more videos, about the bridge is available on the Guinness World Records %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal website Visit a video page false http://www.guinnessworldrecords.com/news/2015/9/bridge-made-out-of-10-000-meccano-pieces-earns-record-for-queen%E2%80%99s-university-stud-397931 false false%>.

Related Content

  • World debut for Ruthmann’s T 720 truck-mounted platform
    April 17, 2013
    The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.
  • EU construction machinery sector needs resolve as Brexit looms
    February 14, 2019
    German construction machinery manufacturers are concerned about a no-deal Brexit – UK exiting the European Union - and the possible disintegration of the EU. Rising global economic challenges can be mastered only with a strong, united Europe, according to the VDMA - Construction Equipment and Building Material Machinery Association. VDMA represents more than 3,200 mostly medium-sized companies in Germany’s mechanical and plant engineering sector. This was the view by attendees at the VDMA’s constructi
  • Nice in 2018: The Pavement Preservation & Recycling Summit (PPRS)
    November 17, 2017
    Siobhan McKelvey, president of the Paris-based International Bitumen Emulsion Federation (IBEF), explains the importance for attending next year’s Pavement Preservation & Recycling Summit. The event will be held in Nice in southern France from 26-28 March at the Nice Acropolis. One of the highlights for me that is provided by the PPRS platform is the opportunity to exchange on communication experiences throughout the world and how the challenges of promoting the role of a good road network are met.
  • Tecnoidea Impianti plants reputation worldwide
    April 9, 2013
    With over 3,600,000m³ of water purified daily in more than 3,000 of its plants all over the world, Tecnoidea Impianti is one of the leading companies worldwide for water purification plants and sludge treatment systems. Its closed-cycle plants are aimed at marble and granites, aggregates and soil washing, tunnelling and concrete areas.