Skip to main content

VIDEO: Piqued at the petrol pump

The definition of insanity is doing the same thing over and over again, but expecting a different result from the first attempt. That goes for some people who wish to put petrol in their car but don’t quite get the spatial thing, as this video shows. The person appears to expect the filler cap to have moved from one side of the vehicle to the other simply because she drove around the petrol pump. Her confusion over the filler cap is nothing compared to other funnier – and sometimes tragic – happening
August 2, 2016 Read time: 1 min
The definition of insanity is doing the same thing over and over again, but expecting a different result from the first attempt. That goes for some people who wish to put petrol in their car but don’t quite get the spatial thing, as this video shows.

The person appears to expect the filler cap to have moved from one side of the vehicle to the other simply because she drove around the petrol pump.

Her confusion over the filler cap is nothing compared to other funnier – and sometimes tragic – happenings when people pull up to the pumps, as this %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal video Youtube video false https://www.youtube.com/watch?v=CnVOJxdq6v4 false false%> shows.

Related Content

  • IRF Launches New Website for World Road Statistics
    April 6, 2017
    The International Road Federation Geneva Programme Centre (IRF Geneva) has been publishing the IRF World Road Statistics (WRS), the most complete and authoritative source of data for the international road, traffic and inland transport sectors for over 50 years. For 2017, IRF Geneva is pleased to announce the launch of a new website (www.worldroadstatistics.org) dedicated to the World Road Statistics. This new website provides all the information about the WRS including the methodology; contents of sections
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • LuiGong celebrates joint venture partnerships
    April 15, 2013
    LiuGong and its partners – Cummins and ZF – chose bauma 2013 to celebrate a string of successes with joint ventures, shared factories, and profitable partnerships. “We looked for only the best partners that share our commitment to excellence,” said Zeng Guang’an, LiuGong’s vice chairman and president. “With Cummins and ZF we believe we have found two of the best.” LiuGong’s joint venture with ZF began in 1995, which allowed the Chinese maker to cost-effectively incorporate high-level ZF technology into its