Skip to main content

VIDEO: Life in the (very) fast lane on Turkey’s Osman Gazi Bridge

Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows. In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire. Turkish media outlet TRTWorld reported that the bike had small win
July 5, 2016 Read time: 2 mins
Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows.

In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire.

Turkish media outlet TRTWorld reported that the bike had small winglets to aid stability and the rider was wearing a special leather suit for the occasion. There was no time to waste. To lower the risk of a tyre blowout, Sofuoglu reached the speed in less than 30 seconds,

The Osman Gazi Bridge is shy of 2.7km in length by only few meters. By contrast, Sofuoglo was anything but shy, pushing his bike to around 100kph faster than he normally does during races.

The suspension bridge crosses the Gulf of Izmit in the Sea of Marmara - around 50km east of Istanbul – and is said to be the fourth-longest suspension bridge in the world and the second longest in Europe. Construction of the quake-resistant bridge began in 2010 and it was inaugurated by president Recep Tayyip Erdogan and prime minister Binali Yildirim on June 30, according to TRTWorld.

The bridge is part of a new 421km six-lane Istanbul-Izmir Highway Project, which is costing around US$6.3 billion. When it is completed, it will cut the journey time between Izmir on the southern Aegean coast and Istanbul to the north from 10 hours to around four hours. The highway project is being built through a public-private partnership and is the first road project in the country to be procured under the Build-Operate-Transfer model.

Construction and operation of the bridge was awarded to a joint venture formed by five Turkish companies - 3338 Nurol, Özaltın, 3340 Makyol, 4149 Yüksel and Gocay – and Italian construction company 1324 Astaldi place in April 2009. The consortium assigned bridge construction to company IHI Corporation from Japan.

The highway is expected to be complete in 2018.

For more information on companies in this article

Related Content

  • Safety issues fuel interest at PIARC’s tunnel conference in Lyon
    June 4, 2019
    Alternative fuel and automated vehicle issues occupied minds at PIARC’s first international road tunnel safety conference. David Arminas reports from Lyon More than ever, tunnel management must done in a wholistic fashion, said Andre Broto, president of PIARC, the World Road Association, based in Paris. With those sentiments, Broto kicked off PIARC’s first International Conference on Tunnel Operations and Safety. One of the first speakers, Sandrine Bernabei Chinzi, head of transport infrastructure at Fr
  • Developments in cycle way monitoring
    February 13, 2012
    A new cycle way monitoring system developed by consultant Cowi and laser electronics company Dynatest in Denmark adds a new dimension to monitoring local road networks. It is developed from standard road condition measurements but is specially tailored for the bicycle path and the particular ride conditions needed for cyclists. The need is growing as the bicycle lane becomes increasingly important around the world. In London a number of special bicycle "super highways" have been introduced, marking off bicy
  • Innovative sealing of world's longest immersed tunnel
    April 16, 2012
    Infrastructure has been chosen to provide a sealing system for the world's longest immersed tunnel. China Communications Construction is said to have selected Trelleborg for the innovative design of its seals, which are claimed to ensure watertightness even through a seismic event. Part of China's prestigious Hong Kong - Zhuhai - Macau link project, the immersed near 6km tunnel will consist of 32 elements. The joints will be sealed with a Trelleborg sealing system including Gina gaskets, Omega seals and wat
  • Alberta to add another wildlife overpass
    April 18, 2022
    The Canadian province said the overpass will be the first outside the federal Banff National Park.