Skip to main content

VIDEO: Life in the (very) fast lane on Turkey’s Osman Gazi Bridge

Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows. In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire. Turkish media outlet TRTWorld reported that the bike had small win
July 5, 2016 Read time: 2 mins
Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows.

In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire.

Turkish media outlet TRTWorld reported that the bike had small winglets to aid stability and the rider was wearing a special leather suit for the occasion. There was no time to waste. To lower the risk of a tyre blowout, Sofuoglu reached the speed in less than 30 seconds,

The Osman Gazi Bridge is shy of 2.7km in length by only few meters. By contrast, Sofuoglo was anything but shy, pushing his bike to around 100kph faster than he normally does during races.

The suspension bridge crosses the Gulf of Izmit in the Sea of Marmara - around 50km east of Istanbul – and is said to be the fourth-longest suspension bridge in the world and the second longest in Europe. Construction of the quake-resistant bridge began in 2010 and it was inaugurated by president Recep Tayyip Erdogan and prime minister Binali Yildirim on June 30, according to TRTWorld.

The bridge is part of a new 421km six-lane Istanbul-Izmir Highway Project, which is costing around US$6.3 billion. When it is completed, it will cut the journey time between Izmir on the southern Aegean coast and Istanbul to the north from 10 hours to around four hours. The highway project is being built through a public-private partnership and is the first road project in the country to be procured under the Build-Operate-Transfer model.

Construction and operation of the bridge was awarded to a joint venture formed by five Turkish companies - 3338 Nurol, Özaltın, 3340 Makyol, 4149 Yüksel and Gocay – and Italian construction company 1324 Astaldi place in April 2009. The consortium assigned bridge construction to company IHI Corporation from Japan.

The highway is expected to be complete in 2018.

For more information on companies in this article

Related Content

  • Nogara Mare bids in Nogara-Mare Adriatico motorway tender
    April 23, 2012
    Italian consortium Nogara Mare is reportedly the favoured bidder in the contract worth around US$2.52billion for the construction and management of the new Nogara-Mare Adriatico motorway in Italy. The motorway will be over 100km long and link the Autobrennero with coastal areas. Nogara Mare was created by Confederazione delle Autostrade, the company promoting the project, with 23% of its ownership belonging to the Italian group Astaldi.
  • Marangoni expanding Turkish market presence
    March 7, 2018
    Tyre specialist Marangoni is making a strategic move of its Turkish operations to Istanbul. This development is aimed at improving the company’s share of the Turkish tyre retreading market. The Italian company is keen to further boost its worldwide market share. Marangoni Retreading Systems has announced a significant development for its Turkish business interests with the new warehouse and head office located in the country’s commercial centre, Istanbul. This move has been managed through its Turkish sub
  • Licenced wear
    June 26, 2012
    A South African motorcyclist tried to obscure the identity of his bike using somewhat novel means, but to no avail. The rider was clocked by police driving at 192km/h along a stretch of road close to Johannesburg. Having secured his underwear over the motorcycle’s licence plate, the rider had hoped to avoid being identified. However the fast response of the police meant the rider was not able to escape and, after the officers had taken down his particulars and removed his underwear to ensure proper identifi
  • Zipping up road lanes
    September 28, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra