Skip to main content

VIDEO: Life in the (very) fast lane on Turkey’s Osman Gazi Bridge

Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows. In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire. Turkish media outlet TRTWorld reported that the bike had small win
July 5, 2016 Read time: 2 mins
Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows.

In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire.

Turkish media outlet TRTWorld reported that the bike had small winglets to aid stability and the rider was wearing a special leather suit for the occasion. There was no time to waste. To lower the risk of a tyre blowout, Sofuoglu reached the speed in less than 30 seconds,

The Osman Gazi Bridge is shy of 2.7km in length by only few meters. By contrast, Sofuoglo was anything but shy, pushing his bike to around 100kph faster than he normally does during races.

The suspension bridge crosses the Gulf of Izmit in the Sea of Marmara - around 50km east of Istanbul – and is said to be the fourth-longest suspension bridge in the world and the second longest in Europe. Construction of the quake-resistant bridge began in 2010 and it was inaugurated by president Recep Tayyip Erdogan and prime minister Binali Yildirim on June 30, according to TRTWorld.

The bridge is part of a new 421km six-lane Istanbul-Izmir Highway Project, which is costing around US$6.3 billion. When it is completed, it will cut the journey time between Izmir on the southern Aegean coast and Istanbul to the north from 10 hours to around four hours. The highway project is being built through a public-private partnership and is the first road project in the country to be procured under the Build-Operate-Transfer model.

Construction and operation of the bridge was awarded to a joint venture formed by five Turkish companies - 3338 Nurol, Özaltın, 3340 Makyol, 4149 Yüksel and Gocay – and Italian construction company 1324 Astaldi place in April 2009. The consortium assigned bridge construction to company IHI Corporation from Japan.

The highway is expected to be complete in 2018.

For more information on companies in this article

Related Content

  • Haulotte wraps it up at Turkey’s Osman Gazi Bridge
    July 5, 2016
    French access group Haulotte and the Turkish access distributor and rental group Acarlar continue to contribute to major infrastructure projects in Turkey, including the new Osman Gazi Bridge. The bridge – the third Bosporus crossing - has just been completed with the installation of the last bridge deck. The bridge will reach a height of 252m and the bridge deck will be nearly 26m wide. When it soon opens, the bridge will be the fourth longest suspension bridge in the world by the length of its central
  • Izmir, Turkey motorway project set to be delayed by at least 18 months
    December 20, 2012
    The construction of the Istanbul-Izmir motorway in Turkey is set to be delayed by at least 18 months due to insufficient funds being in place to complete the major new highway. Turkey's Transport and Communication Minister Binali Yildirim has warned the Nurol-Özaltn-Makyol-Astaldi-Yüksel-Göçay joint venture, who are responsible for the construction of the motorway, that it will be in breach of the project’s contract, signed in October 2010, imposing a strict completion deadline of five-and-a-half years.
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
  • Two new tunnel links for Turkey
    August 28, 2013
    Two new tunnel connections in Turkey will improve transport in key areas. The new Kemerhisar-Pozanti Highway features tunnels along its length and this key route will improve connections between the country’s capital Ankara and its commercial centre Istanbul as well as to the south-east of the country. The highway will have wider benefits too as it will allow better transportation through Turkey between Europe and the Middle East. And in the busy port city of Izmir, the new Konak Tunnel will reduce jour