Skip to main content

VIDEO: He shoots! He scores!

Many manufacturers claim that their machines are “versatile” or “flexible”, even “fast reacting” when working on site. But life shouldn’t be all work and no play.
September 2, 2016 Read time: 1 min

Many manufacturers claim that their machines are “versatile” or “flexible”, even “fast reacting” when working on site.

But life shouldn’t be all work and no play. Even excavators and their drivers need a day off for some fun and one New York state contractor, 8493 Fastracs, has for three years made the point. Fastracs owner Leith Cookingham and his crew put on the 3rd Annual Fastracs auto soccer game show last April.

The football for this five-a-side games, which took place in the town of Red Hook, was nearly 2.5m in diameter – that’s 8 feet for our North American readers.

The action was filmed by cameras aboard a drone, from Dà-Jiāng Innovations Science and Technology, a Chinese company based in Shenzhen, Guangdong province.

For more information on companies in this article

Related Content

  • Concrete plants: flexibility and efficiency
    March 17, 2016
    Concrete mixing plants are becoming more flexible and innovative to ensure they meet increasingly stringent construction schedules. Increasing demands are put on contractors to cut down the transportation of material to construction sites in the name of efficiency and the environment. For that reason concrete mixing plants are increasingly flexible in their transportation to sites, their set up times and their output. Ammann Elba, the company created when German-based Elba was acquired by Ammann in 20
  • Urban resurfacing on tracks with Caterpillar Paving
    July 9, 2024
    A UK contractor is making good use of its latest Caterpillar’s Cat Mobil-Trac paver for urban resurfacing works – Mike Woof reports
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b