Skip to main content

VIDEO: Good car winter maintenance is snow joke

Even conscientious professional people can get caught out by severe winter weather, as this video from Canada shows. We at World Highways hope that all our valued readers in the globe’s chillier regions have taken the time this season to ensure their safety by winterising their vehicles. It’s important to get it right. So the staff at World Highways would like to recommend that readers click here to take a quick look at some of the best - and worst - tips for winterising their personal vehicle. Fo
January 27, 2016 Read time: 2 mins
Even conscientious professional people can get caught out by severe winter weather, as this video from Canada shows.

We at World Highways hope that all our valued readers in the globe’s chillier regions have taken the time this season to ensure their safety by winterising their vehicles.

It’s important to get it right.  So the staff at World Highways would like to recommend that readers %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here view recommendation page false http://www.automoblog.net/2015/12/13/the-absolute-worst-winter-maintenance-tips/ false false%> to take a quick look at some of the best - and worst - tips for winterising their personal vehicle.

For example, remove your front tyres for better handling in snow conditions. Or change the lighter summer air in your tyres for a heavier winter air. Maybe you should double check the bearing in your muffler or exhaust unit to ensure a smooth air flow?

Also, a four-pack of energy should he added to your radiator’s coolant. Energy drinks apparently have large amounts of vitamin B that can enhance coolant efficiency and radiator life.

Energy drink can also be added to the transmission fluid reservoir. The drink’s folic acid helps to repair minor holes in the lines.

Take the advice of the experts from World Highways, and make sure you aren’t left spinning your wheels this winter.

Related Content

  • C-ing is believing for Cat telehandlers
    April 12, 2012
    Caterpillar says its new Telehandlers - TH336C, TH337C, TH406C and TH407C - feature the company’s C4.4 ACERTTM engines that meet Stage IIIB emissions standard and are available in a 92.6kW (124 hp) or a 106kW (142hp) rating. The C4.4 engine is said by Cat to be designed and manufactured to ensure smooth, quiet operation and longevity. Fuel consumption is also said to be optimised to match the tasks, lowering operating costs. A larger, redesigned cooling package with a hydraulic reversing demand fan is also
  • Vietnam Expressway Corp to sell five highway routes
    October 31, 2014
    Vietnam is considering selling its ownership in several major highways to help pay for more road projects. The Ministry of Transport (MoT) recently said that the government’s infrastructure investor body Vietnam Infrastructure Development and Finance Investment (VIDIFI), would sell 70% of its ownership in the Hanoi–Hai Phong Highway project to a buyer from India. The move is part of a strategy that could see Vietnam sell off more of its investment in highway projects, either under construction or complete
  • Godshilla makes a run for it and blocks Isle of Wight road
    February 23, 2016
    It was a heart-stopping moment late one night as a car approached an 8m tall animal that was blocking the road. Most people, seeing what should have been an extinct dinosaur – a triceratops – in their path would have turned and run in the opposite direction. But for people in the English village of Godsill, on the Isle of Wight, the dinosaur was a well-known resident, albeit not a living animal. Chris Hollingshead snapped the photo and put it on his Facebook, which can be seen by clicking here.
  • Start of Torrens section upgrade of Adelaide’s North-South Corridor
    August 12, 2015
    Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor. Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway. The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestr