Skip to main content

VIDEO: Gap closed for Gordie Howe Bridge

A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
By David Arminas July 26, 2024 Read time: 3 mins
Workers will now stress stay cables (image courtesy Windsor-Detroit Bridge Authority - WDBA

Canadian and American workers on the Gordie Howe International Bridge recently celebrated the final steps taken to close the deck gap on the US$4.7 billion structure.

The 26m gap was closed this month on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.

The 853m main bridge deck between the two towers makes it the longest main span of any cable-stayed bridge in North America and the tenth longest in the world. Clearance above the river is 42m. It will also be the longest composite steel and concrete bridge deck for any cable-stayed bridge in the world, according to the Windsor-Detroit Bridge Authority (WDBA), a not-for-profit Canadian Crown corporation created to deliver the project through a public-private partnership.

WDBA is responsible for overseeing and managing the construction and operation of the new crossing. Meanwhile, Bridging North America, BNA, is the main joint venture contractor - Fluor, ACS Infrastructure Canada and Aecon Group - for the design, build, finance, operation and maintenance of the project.

Workers will now stress stay cables and install electrical, fire suppression and drainage systems, barriers, signage, lighting, deck paving and pavement markings and complete the multi-use path.

Early work for the bridge started in summer 2018 and it was originally set to open in November 2024. But disruptions due to the COVID-19 pandemic pushed back the date and increased costs from the original $4.3 billion.

Bridging North America said that the four-week, multi-step, precision process to close the gap included the placement and removal of temporary bents and the installation of the final steel girders, beams, panels and precast concrete.

“The team has worked incredibly hard since 2018 to achieve this important project milestone,” said Shawn West, president of Fluor’s infrastructure business. “The connection of this iconic bridge serves as a testament to our dedication and perseverance to build safe and reliable infrastructure. This bridge will soon serve as a major gateway between Canada and the United States.”

While the main focus of construction has been on the bridge deck, progress is also being made on the Ports of Entry in Canada and the US, as well as the connection to I-75. When completed in autumn next year, the bridge will include six lanes of traffic, two ports of entry, a multi-use path, a new interchange at I-75 with four new road bridges, five pedestrian bridges and four interchange ramps connecting I-75 to the U.S. Port of Entry. Fluor and ACS will operate and maintain the facility for 30 years for the WDBA.

The Canadian government will receive all toll revenues, the project being totally Canadian with no US funding.

For more information on companies in this article

Related Content

  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • $1.49 billion for Oregon-Washington bridge
    August 26, 2024
    The existing Interstate 5 bridge connecting Portland and Vancouver over the Columbia River in the US northwest is actually two parallel bridges – one dating back to 1917.
  • Emovis continues with Mersey Gateway tolling
    March 18, 2022
    Emovis provides collection of tolls and charges for both Mersey Gateway Crossing and the older 87m-long Silver Jubilee Bridge through its merseyflow brand name.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o