Skip to main content

VIDEO: Concrete paving - you’ve come a long way, baby!

It’s 1948. The grand scheme of creating an Interstate Highway system in the US is still barely a twinkle in President Dwight Eisenhower’s military eye. Highway construction improved greatly in the late 1950s and early 1960s as the American contractors became more mechanized and therefore efficient at laying roads faster and of better quality. But how did they build a road back then in 1948? Thanks to Encyclopaedia Britannica Films, we have a movie of just how a concrete highway was created. The constr
July 14, 2016 Read time: 2 mins
It’s 1948. The grand scheme of creating an Interstate Highway system in the US is still barely a twinkle in President Dwight Eisenhower’s military eye. Highway construction improved greatly in the late 1950s and early 1960s as the American contractors became more mechanized and therefore efficient at laying roads faster and of better quality.

But how did they build a road back then in 1948?

Thanks to Encyclopaedia Britannica Films, we have a movie of just how a concrete highway was created. The construction site looked more like a chain gang from a nearby prison that a professionally done infrastructure project.

Viewers just might be able to feel the sun’s heat as workers toil into the long day.

If this video piqued your curiosity about road building projects back then, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal click here Visit youtube Page false https://www.youtube.com/watch?v=neaoGclvips false false%> to see a 1951 film from the Bethlehem Steel Company. Things have apparently moved on since 1948 and steel is making inroads. At least this film is in colour.

Related Content

  • Hiab’s versatile and eco-friendly loader crane
    January 31, 2013
    Cargotec brand Hiab has launched the Hiab XS 544 - a 51m tall loader crane said to feature efficient load handling, greater versatility and reduced environmental impact. Functions such as HiPro, endless slewing and a variable pump are said to make the Hiab XS 544 even better at working in tough conditions with retained stability, high capacity and improved fuel economy. Sergio Peiró, product manager for heavy range cranes at Hiab Loader Cranes, took part in the creation of the Hiab XS 544 and feels it combi
  • Major Norwegian tunnel project opening
    September 20, 2019
    Norway’s landmark tunnel project is due to open at the end of 2019. The Ryfylke tunnel will be both the longest and deepest undersea road tunnel built anywhere in the world when it opens to traffic. The new link connects the city of Stavanger with Strand in the district of Ryfylke. Two other tunnels form part of the project to build the new Ryfast link. These are the Hundvåg tunnel and the Eiganes tunnel, due to open in February 2020 once finishing and testing works have been completed. The opening of all t
  • Hamburg wheel tracker leads three new testing machines from Gilson
    March 11, 2014
    Three key highlights gracing the new materials testing machines on display at Conexpo 2014 from Gilson Company are: its Hamburg Immersion Wheel Tracker, a Superpave Gyratory Compactor and a new version of the company’s Rotary Sifters. The Hamburg Wheel Tracker comes with stainless steel wheels (although rubber wheels are available as an option) and the machine has been put together to allow two specimens to be tested independently in a recirculating water bath. Control testing temperatures range between 20
  • JCB emissions compliant engines to launch in wheeled loaders
    January 6, 2017
    JCB will launch 427 and 437 wheeled loaders at Bauma, powered by Stage IIIB/Tier 4 Interim Cummins engines. First seen in prototype form at last year’s Intermat show, the two loaders are powered by the Cummins QSB6.7 engine, which offers a 9.4% increase in torque over the previous model. This drives through a lock-up converter and customers can choose a standard four-speed or optional five-speed transmission, which delivers a 16% drop in fuel consumption. In-cab noise levels have been reduced to just 68dB(A