Skip to main content

VIDEO: Changing a tyre, Saudi Arabian style

The next time you are worried or irritated about changing a flat tyre, don’t be. Just be grateful that the vehicle is not moving. Be grateful that your car is also not being driven along on only two wheels. This five-minute video is a tribute to a lot of things, not least the driver’s skill in keeping the SUV up on two wheels and steady enough for the five people working on the tyre change. But consider the skills of those changing the tyres.
February 23, 2016 Read time: 2 mins
The next time you are worried or irritated about changing a flat tyre, don’t be.

Just be grateful that the vehicle is not moving. Be grateful that your car is also not being driven along on only two wheels.

This five-minute video is a tribute to a lot of things, not least the driver’s skill in keeping the SUV up on two wheels and steady enough for the five people working on the tyre change.

But consider the skills of those changing the tyres.

Notice, also, the little glitch where the last person back into the car’s interior tries to close the door. It is a suicide-opening door that must be closed before the front door is closed. So they have to open the front door and then close the rear door first. A small thing, given that the ‘tyre change’ was successful.

Related Content

  • Looking ahead for Power Curbers
    September 26, 2023
    Power Curbers president Stephen Bullock discussed business trends with Mike Woof
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as