Skip to main content

VIDEO: Changing a tyre, Saudi Arabian style

The next time you are worried or irritated about changing a flat tyre, don’t be. Just be grateful that the vehicle is not moving. Be grateful that your car is also not being driven along on only two wheels. This five-minute video is a tribute to a lot of things, not least the driver’s skill in keeping the SUV up on two wheels and steady enough for the five people working on the tyre change. But consider the skills of those changing the tyres.
February 23, 2016 Read time: 2 mins
The next time you are worried or irritated about changing a flat tyre, don’t be.

Just be grateful that the vehicle is not moving. Be grateful that your car is also not being driven along on only two wheels.

This five-minute video is a tribute to a lot of things, not least the driver’s skill in keeping the SUV up on two wheels and steady enough for the five people working on the tyre change.

But consider the skills of those changing the tyres.

Notice, also, the little glitch where the last person back into the car’s interior tries to close the door. It is a suicide-opening door that must be closed before the front door is closed. So they have to open the front door and then close the rear door first. A small thing, given that the ‘tyre change’ was successful.

Related Content

  • Astec’s Batch RAP stems ahead
    August 24, 2016
    Standards are changing to allow higher percentages of RAP, and batch plant owners want to take advantage of the recycled material. But unsightly steam and dust can escape from the mixer. The best way to counter this is to meter the amount of RAP being added to a batch system rather than adding it all at once. This is where Astec’s Batch RAP system comes into play. “The trouble with running RAP in a batch plant is that if you just dump the RAP in fast, you have serious problems with steam,” according t
  • New Wear Crossing cables fully installed and tensioned to 50%
    September 21, 2017
    Structural engineering company VSL International has installed all 28 cable stays of England’s New Wear Crossing and stressed them to 50% of their design load. The next stage of stressing the cables will happen next month and be to 100% of design load. This will allow the construction team to adjust and tension them just enough to lift the bridge deck off the blue steel temporary supports that were constructed in the river to take the weight of the structure.
  • We're here to help
    July 16, 2012
    Formed at the end of the Cold War, the European Bank for Reconstruction and Development has raised, and loaned, billions to revitalise infrastructure from central Europe to central Asia as Patrick Smith reports One of the highlights of the year for Thomas Maier has been the recent trip to Bratislava, the capital of Slovakia, where history was made. As the Business Group director in charge of the infrastructure sector at the European Bank for Reconstruction and Development (EBRD) he was present when contract
  • New developments in bitumen technology
    November 30, 2020
    From softwood in Sweden to rubber and rubble in Australia - Kristina Smith reports on new technologies which could shape tomorrow’s asphalt mixes