Skip to main content

VIDEO: Buffer buffoonery beggars belief

How many workers does it take to get back under control a concrete buffer that won’t be tied down? Quite a lot, apparently, as this video shows. The real question is, which cement-head lost control of his buffer in the first place?
May 12, 2016 Read time: 1 min
How many workers does it take to get back under control a concrete buffer that won’t be tied down? Quite a lot, apparently, as this video shows. The real question is, which cement-head lost control of his buffer in the first place?

Related Content

  • IAM calls for national driving health checks for elderly drivers
    March 27, 2014
    The UK-based IAM (Institute of Advanced Motorists) is calling on the British government to introduce a national strategy of driving health checks and better information for elderly drivers and their families. The call comes after a poll showing that 42% of the population are worried about an elderly relative driving, yet they are unlikely to do anything about it. The IAM and Vision Critical poll of 1,297 people shows that while concern about elderly drivers is evident, acting on our concerns is another
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • What matters most: an expert’s insight into purchasing light equipment
    July 19, 2021
    Sometimes, it seems that the biggest differentiator between various brands of light equipment is their paint colour. Yet there is plenty to compare when you look beyond the surface.