Skip to main content

VIDEO: Buffer buffoonery beggars belief

How many workers does it take to get back under control a concrete buffer that won’t be tied down? Quite a lot, apparently, as this video shows. The real question is, which cement-head lost control of his buffer in the first place?
May 12, 2016 Read time: 1 min
How many workers does it take to get back under control a concrete buffer that won’t be tied down? Quite a lot, apparently, as this video shows. The real question is, which cement-head lost control of his buffer in the first place?

Related Content

  • Krohne Optiwave 6300 C takes the guesswork out of silo measuring
    August 3, 2017
    A variety of issues affect accurate continuous level measurement inside cement plants. The most critical concerns are dust, heavy build-ups, low-reflective media and uneven surfaces in conical and/or air-injected silos with internal objects. Now, new frequency-modulated continuous-wave – FMCW - radar technology, combined with high signal dynamics, offers a way to accurately and reliably measure product levels.
  • Rokbak RA30 & RA40 set to impress
    February 13, 2023
    Rokbak is bringing a pair of its haulers and a strong team to show exactly how the brand has become a major mover in both the US and global markets.
  • CONEXPO/CON-AGG opens doors to biggest-ever staging of the exhibition
    March 14, 2023
    The biggest-ever staging of the CONEXPO-CON/AGG exhibition in Las Vegas, Nevada, USA, was getting underway today.
  • Highways UK event highlights the time for change for Highways England
    November 13, 2015
    The planning of strategic highways in England is locked into a two-tier mentality that is not good for the economy or for society. It is time to change. That is the message that David Quarmby, former chair of the RAC Foundation and head of RJRF’s Major Roads for the Future study, will be bringing to Highways UK, the landmark new roads conference at ExCel, London, 25th-26th November. In his keynote address Quarmby will argue that while welcome new funds, a new planning regime and a new arm’s length ro