Skip to main content

VIDEO: Buffer buffoonery beggars belief

How many workers does it take to get back under control a concrete buffer that won’t be tied down? Quite a lot, apparently, as this video shows. The real question is, which cement-head lost control of his buffer in the first place?
May 12, 2016 Read time: 1 min
How many workers does it take to get back under control a concrete buffer that won’t be tied down? Quite a lot, apparently, as this video shows. The real question is, which cement-head lost control of his buffer in the first place?

Related Content

  • Amey trials gully sensors in UK to help prevent road flooding
    November 25, 2016
    Engineering and public services provider Amey is installing state-of-the-art sensors into gullies on UK highways in a trial aimed at preventing the flooding of roads.
  • bauma Innovation Awards for six companies and research institutions
    April 11, 2016
    Six companies and research institutions have received bauma 2016 Innovation Awards. Ilse Aigner, the Bavarian minister of economics, praised the winners and all participating companies, emphasising that the awards programme “reflects the innovative strength of the construction equipment, building material and mining industries, both in Germany and internationally”. Not only does it show the things which are technically feasible, but it also gives us a glimpse of the future, she added.
  • FM Conway chairman passes away after cancer battle
    March 18, 2022
    FM Conway chairman Michael Conway has passed away after a cancer battle.
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S