Skip to main content

VIDEO: Brazilian cyclists caught on camera drafting a truck

Just how dangerous is it for a cyclist to draft a fast moving vehicle? Probably very dangerous but that means only some cyclists will attempt it, as these videos shows. At the start of this video from Brazil, the cyclist on the right appears to attach his Go Pro camera to the rear of the truck that they are drafting. It is not until about 3:55 seconds into the video that the speed picks up and reaches reportedly 124kph. Near the end of the video, the one cyclist left appears to take back the camera off t
January 18, 2016 Read time: 2 mins
Just how dangerous is it for a cyclist to draft a fast moving vehicle? Probably very dangerous but that means only some cyclists will attempt it, as these videos shows.

At the start of this video from Brazil, the cyclist on the right appears to attach his Go Pro camera to the rear of the truck that they are drafting. It is not until about 3:55 seconds into the video that the speed picks up and reaches reportedly 124kph. Near the end of the video, the one cyclist left appears to take back the camera off the back of the truck.

Also in this video, the lone cyclist left drafting has to do what is called a bunny hop – jump up with the bike to miss an object. In this case he is trying to miss the cat’s eyes that separate the lanes, a doing it at around 100kph.

You would have thought that he would have at least worn a helmet.

But then neither did this commuter in Barcelona, even though he was doing around 80kph behind a bus, according to media %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal reports visit the media report page false http://www.dailymail.co.uk/news/article-3398199/Daring-cyclist-filmed-riding-just-INCHES-bus-50mph-incredibly-stupid-bid-capitalise-vehicle-s-slipstream.html false false%>. He was caught on camera sailing through one of the tunnels that are part of the B-10, also known as Ronda Litoral, a 20km coastal ring road around the southern Spanish port.

Related Content

  • Industry insight from Caterpillar
    January 6, 2017
    A group of senior executives from Caterpillar spoke to journalists in a round table discussion, providing insight into the company’s future direction. Giving key talking points were: Rob Charter, vice president Excavation Division; Paulo Fellin, vice president, Global Construction and Infrastructure; Mary H Bell, vice president of Building and Construction Products; and Karl Weiss, vice president Earthmoving Division.
  • Industry insight from Caterpillar
    April 17, 2013
    A group of senior executives from Caterpillar spoke to journalists in a round table discussion, providing insight into the company’s future direction. Giving key talking points were: Rob Charter, vice president Excavation Division; Paulo Fellin, vice president, Global Construction and Infrastructure; Mary H Bell, vice president of Building and Construction Products; and Karl Weiss, vice president Earthmoving Division.
  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • VIDEO captures unloved, unowned Reynolds Bridge reduced to rubble
    May 18, 2015
    There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge. It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s. Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck