Skip to main content

Vejdirektoratet tenders more Kalundborg

The Danish Road Directorate said the work on stage three of the Kalundborg Motorway will include a new junction facility as well as a large fauna underpass, a road bridge and two pedestrian bridges.
By David Arminas June 6, 2025 Read time: 2 mins
Sweco did design work on the second stage of Denmark’s Kalundborg Motorway, a new 6.5km section that now runs south of Regstrup, between Kvanløse and Dramstrup (image courtesy Sweco)

The Danish Road Directorate, Vejdirektoratet, has launched a tender worth US$80.3 million for the third and final stage of the Kalundborg Motorway.

Construction on the 8km stage will be further divided, into four sub-stages. The section includes, apart from a new road, the relocation of some roads and two ramps for a new junction facility as well as a large fauna underpass, a road bridge and two pedestrian bridges. The work is included in the country’s Infrastructure Plan 2035.

In September 2019, the Roads Directorate opened the entire second stage of the Kalundborg Motorway – a new 6.5km section that now runs south of Regstrup, between Kvanløse and Dramstrup. According to Sweco, which was initially responsible for tender design, it involved expansion of around 1.5km of Skovvejen into a four-lane motorway as well as construction of 5km of new four-lane motorway south of Regstrup. Apart from a new road, the second stage involved the design and implementation of connecting ramps, structures, noise screens and road lighting and cutting roads and paths.

According to the Sweco website, during the detailed design, Sweco served as lead consultant to MJ Eriksson. Sweco worked with a number of design packages using 3D CAD models and BIM workflows, so that the path through the Danish Road Directorate’s comment process was as quick as possible.

For more information on companies in this article

Related Content

  • Tanzania delivers road construction boost
    November 2, 2012
    Plans to upgrade two major roads in Tanzania will bring huge benefits to the East African nation. Shem Oirere reports Tanzania’s bid to retain or improve its position as East Africa’s second largest economy is gaining momentum as the government moves to support the achieved growth and contribute more to ongoing regional economic integration through the improvement of its transport infrastructure. The country received a major boost in April, 2012, when the African Development Bank (AfDB), one of Tanzania lea
  • Paraguay to tender first bi-oceanic section: Carmelo Peralta and Loma Plata
    November 3, 2015
    Paraguay’s Ministry of Public Works and Communications will tender for the first part of the bi-oceanic corridor project this month. Work involves paving on the 255km section between Carmelo Peralta, Cruce Centinela and Loma Plata in the western region of the country under a turnkey format. The first section of the road is expected to require an investment of around US$280 million. The second stage of the project that will connect Paraguay with Argentina and cost $340 million. Work include paving
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t