Skip to main content

Vehicle emissions strategy

Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The European Investment Bank (EIB) and European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is k
July 3, 2012 Read time: 2 mins
Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The 1054 European Investment Bank (EIB) and 1166 European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the 2465 European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is keen to sign the contracts for the project, the EC is holding back until the answers are provided. The Slovakian Transport Ministry has said that it may opt to change the route of the controversial section of the Martin- Presov highway to meet requests from the European Commission. Environmental groups have suggested building tunnels but the Transport Ministry says that this would be too expensive. The latest developments mean that the highway may not be completed by 2013 as planned.

Related Content

  • Tanzania delivers road construction boost
    November 2, 2012
    Plans to upgrade two major roads in Tanzania will bring huge benefits to the East African nation. Shem Oirere reports Tanzania’s bid to retain or improve its position as East Africa’s second largest economy is gaining momentum as the government moves to support the achieved growth and contribute more to ongoing regional economic integration through the improvement of its transport infrastructure. The country received a major boost in April, 2012, when the African Development Bank (AfDB), one of Tanzania lea
  • Delays ahead for Slovakia’s Visnove tunnel
    September 5, 2018
    Slovakia's transport ministry says the 7.5km Visnove tunnel near Zilina, part of the D1 motorway, will be delayed by two years to open in 2022. The recent announcement came as the ministry agreed to an extension to the construction permit held by Salini Impregilo for work on the twin-tube tunnel. The design-and-build contract worth about €410 million was assigned to the Salini Impregilo-led joint venture DUHA in 2014 by the National Highway Company NDS.
  • EBRD supporting Skopje road rehabilitation
    May 1, 2012
    The European Bank for Reconstruction and Development (EBRD) is supporting the modernisation of the urban roads system in the Macedonian capital Skopje, with a ?5.6 million loan to introduce a modern traffic management system and upgrade one of the key arteries in the city.
  • Poland's big transport plans
    July 6, 2012
    The European Investment Bank (EIB) looks likely to grant Poland a loan of €1.6 billion to carry out several key infrastructure projects. Some of the money will be used to finance the A2 highway from Lodz to Warsaw; Warsaw's southern ring road and a 50km section of the A4 highway to link with Germany.