Skip to main content

US$96mn motorway expansion works in Costa Rica

FCC Construccion Costa Rica has started expansion works on the Canas - Liberia stretch of the country’s Interamericana Norte motorway. The work includes increasing the number of lanes on the road to four and the creation of a bicycle lane. The US$96million project is being funded by the Inter-American Development Bank (BID).
May 25, 2012 Read time: 1 min
4914 FCC Construccion Costa Rica has started expansion works on the Canas - Liberia stretch of the country’s Interamericana Norte motorway.

The work includes increasing the number of lanes on the road to four and the creation of a bicycle lane. The US$96million project is being funded by the 2791 Inter-American Development Bank (BID).

For more information on companies in this article

Related Content

  • Costa Rica’s deficient roads need improvement
    September 17, 2019
    A new report has highlighted major deficiencies across many of Costa Rica’s key road connections.
  • Costa Rica to replace Conavi with a National Infrastructure Institute
    March 14, 2016
    Amid concerns over the efficiency of Costa Rica’s highways agency Conavi, the authority has been given more time to provide details on expansion of Route 32, according to the La Republica newspaper. Conavi has been at loggerheads with the Treasury Inspector's Office which wants Conavi to move faster and authorise a contract for the expansion of road between Rio Frio and Limon granted to China Harbour Engineering Company. China Harbour has been requesting further details about the US$395 million projec
  • Costa Rica: environmental possibly loom for Route 32 to Moin port
    October 18, 2016
    A construction start to the extension of Route 32 between Rio Frio and Limon is set for another setback after the government demanded more environmental work to be done. La Republica newspaper is reporting that Costa Rica’s Secretariat of Environment (Setena) Wants China Harbour Engineering Company (CHEC), to provide more information on the environmental impact of the proposed 107km project. Marco Arroyo, president of Setena, has told CHEC would it has until April 2017 to provide the information on v
  • New Nicaragua coast connecting route
    May 8, 2019
    A new road connection is now open to traffic in Nicaragua, connecting the country’s coasts. T