Skip to main content

US$70.16bn to be spent on 500 major Sichuan projects in 2012

The Sichuan Development and Reform Commission plans to spend US$70.16billion on 500 major projects in the Chinese province during 2012. Work on 11 rail projects will begin in 2012. Of those, construction on a 99.27km section of the Kunming-Chengdu line and the 520km Guiyang-Chengdu are due for completion in 2017. This will follow the proposed 2015 completion of a 135.41km section of the Kunming-Chengdu line and the 99.09km Pujiang-Chengdu line, and the earmarked 2016 completion of the 510.5km Chengdu-Xi'an
April 23, 2012 Read time: 2 mins
The Sichuan Development and Reform Commission plans to spend US$70.16billion on 500 major projects in the Chinese province during 2012.

Work on 11 rail projects will begin in 2012. Of those, construction on a 99.27km section of the Kunming-Chengdu line and the 520km Guiyang-Chengdu are due for completion in 2017. This will follow the proposed 2015 completion of a 135.41km section of the Kunming-Chengdu line and the 99.09km Pujiang-Chengdu line, and the earmarked 2016 completion of the 510.5km Chengdu-Xi'an line.

Five highways in Sichuan are also being upgraded this year. The 92km Xuyong-Yibin highway is due for completion in 2014 before the 2015 completion of the 120km Xichong-Mianyang highway, the 437.7km ring road in Chengdu and the 127km Hanyuan-Leshan highway. The 160km Jinsha River-Renshou highway is due to be finished by 2016.

Continuing the massive capital building programme in 2012 will be work on four airports. The airports in Yibin and Luzhou are scheduled to be concluded in 2015, while works on Daocheng Yading and Aba Hongyuan airports are due for completion in 2013 and by the end of 2012 respectively.

Related Content

  • Australia: US$1.39bn federal budget for Victoria’s East West Link second phase
    May 2, 2014
    The Australian government is providingUS$1.39 billion (AUD 1.5 billion) to finance the second phase of Victoria state’s 18km long East West Link road project. According to a statement, the infusion will allow both stages to be built simultaneously. As a result, the project could be completed by 2023. The second stage of the road project will link the Western Ring Road to the eastern section, connecting CityLink and the Eastern Freeway.
  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • US$766.15bn to be invested in China road network expansion
    June 24, 2013
    Over the next 17 years, China will invest US$766.15 billion (CNY 4.70tn) to expand the country's major road network by over two times. By 2030, the length of roads in China is expected to total 5.8 million kilometres, with trunk ways and highways making up 7% of the total. Provincial and countryside roads are expected to account for 9% and 84% respectively. According to a road expansion blueprint approved in May 2013 by the State Council, the length of toll-free trunk ways and toll highways should by 2030 i
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports